Del Sol NRG INC

How many solar installs has Del Sol NRG INC done in California, and which license number is on its installs?

Del Sol NRG INC has 319 residential solar installs interconnected in California, active in the records from 2014 through 2024 (Aug 7, 2014 to Apr 23, 2024), most of them in Contra Costa County (288), San Joaquin County (9) and Alameda County (8). CSLB lists license 1008525 (CLEAR DAY ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Del Sol NRG INC here carry more than one CSLB license number: 1008525 on 295 (CSLB holder CLEAR DAY ENERGY, Brentwood) and 996992 on 20 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
319
Last 24 months
0
Total capacity
2,349.6 kW DC
Median system size
6.7 kW DC
With battery storage
0.6% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 319 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
19.6 kWh (1 installs list a capacity)
First install
Aug 7, 2014
Latest install
Apr 23, 2024
Counties
12
Utilities
PGE 319
CSLB license
1008525, 996992

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201440
2015180
2016520
2017790
2018882
2019770
202000
202100
202200
202300
202410
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 319 interconnected installs with a tariff recorded (319) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.07824.5%not counted
NEM 2.024175.5%2 (0.8%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Del Sol NRG INC’s installs. No residential system in the file lists a third-party owner name that matches Del Sol NRG INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 317 of Del Sol NRG INC’s 319 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (114, 36.0%) used modules recorded as SolarWorld.

Across all years, 319 of Del Sol NRG INC’s 319 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (248, 77.7%) used inverters recorded as Enphase.

Across all years, 3 of Del Sol NRG INC’s 319 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used batteries recorded as LG.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld0114
LG092
Qcells051
Trina Solar021
SunPower013
Inverter makerEnphase0248
SolarEdge045
SMA014
SunPower013
Battery makerLG03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 317 of 319 installs, inverters on 319. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Del Sol NRG INC as developer on 21 battery storage projects and as installer on 19 (19 name it as both), 21 projects in all with 271 kWh of storage. 13 have the status Paid, with $34,461 in current incentive allocations. Applications were received from Jan 8, 2019 to Dec 23, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid13183$34,461
Cancelled889$20,700

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage19233$45,64311$24,943
Large-Scale Storage238$9,5182$9,518

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1008525CLEAR DAY ENERGY (Corporation)CLEARB General Building ContractorOct 29, 2015Oct 31, 2027295
996992Not found in the CSLB License Master file pulled Nov 4, 202620

License numbers are the ones the utilities recorded on the interconnection applications (315 of 319 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1008525. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Del Sol NRG INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021Total
unincorporated Marin County100852511

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Contra Costa288
San Joaquin9
Alameda8
Calaveras2
Nevada2
Placer2
Santa Clara2
Solano2
El Dorado1
Madera1
San Mateo1
Yolo1

Top cities

CityInstalls
Brentwood161
Oakley32
Byron25
Discovery Bay24
Antioch21
Concord6
Danville4
Manteca4
Martinez3
Orinda3
Tracy3
Grass Valley2
Oakland2
Pittsburg2
Pleasanton2

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Del Sol NRG INC217
Del Sol NRG62
Del Sol NRG Inc.24
Del Sol NRG, LLC9
Del Sol NRG INC.3
Del Sol NRG Inc2
Del Sol NRG Inc. dba: CLEAR DAY ENERGY1
Del Sol NRG, INC1

Common questions

Where does Del Sol NRG INC install solar?

Its installs are spread across 12 counties. The most are in Contra Costa County (288 installs), followed by San Joaquin County (9).

How often does Del Sol NRG INC install batteries with solar?

0.6% of its interconnected solar installs include battery storage across all years.

How many Del Sol NRG INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 319 interconnected installs with a tariff recorded (319) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.