DELTA CONSTRUCTION AND DESIGN INC

How many solar installs has DELTA CONSTRUCTION AND DESIGN INC done in California, and which license number is on its installs?

DELTA CONSTRUCTION AND DESIGN INC has 55 residential solar installs interconnected in California, active in the records from 2024 through 2025 (Apr 23, 2024 to Jul 21, 2025), most of them in San Bernardino County (26), Riverside County (24) and Kern County (2). The license number recorded on most of its installs, 782999, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
55
Last 24 months
41
Total capacity
406.1 kW DC
Median system size
7.2 kW DC
With battery storage
100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
96.4% of 55 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
55 installs, latest Jul 21, 2025
Ownership types recorded
PPA 53
Median battery size
5 kWh (51 installs list a capacity)
First install
Apr 23, 2024
Latest install
Jul 21, 2025
Counties
6
Utilities
SCE 51, PGE 3, SDGE 1
CSLB license
782999

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
20243029
20252525
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

55 of its 55 interconnected installs (100.0% of the 55 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jul 21, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.000.0%0
Net Billing Tariff55100.0%54 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 53 of DELTA CONSTRUCTION AND DESIGN INC’s installs the utility recorded a third-party ownership type: PPA 53, lease 0, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches DELTA CONSTRUCTION AND DESIGN INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Everbright45
Palmetto Solar5
Everbright Solar2
Delta Construction and Design1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 41 of DELTA CONSTRUCTION AND DESIGN INC’s 41 installs name a module maker in the “Generator Manufacturer” fields, and most of those (39, 95.1%) used modules recorded as Canadian Solar.

In the last 24 months, 41 of DELTA CONSTRUCTION AND DESIGN INC’s 41 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (41, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 41 of DELTA CONSTRUCTION AND DESIGN INC’s 41 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (41, 100.0%) used batteries recorded as Enphase.

54 of 54 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar3953
Qcells77
LONGi44
SunPower33
Mission Solar22
Inverter makerEnphase4155
SolarEdge1212
SMA33
Solis (Ginlong)11
Battery makerEnphase4153

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 55 of 55 installs, inverters on 55. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
782999Not found in the CSLB License Master file pulled Nov 4, 202655

License numbers are the ones the utilities recorded on the interconnection applications (55 of 55 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list DELTA CONSTRUCTION AND DESIGN INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2024Total
unincorporated San Diego County78299911

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Bernardino26
Riverside24
Kern2
Fresno1
Los Angeles1
San Diego1

Top cities

CityInstalls
Fontana18
Lake Elsinore9
Moreno Valley6
Perris6
Victorville3
Bakersfield2
Rialto2
Adelanto1
Baldwin Park1
Escondido1
Fresno1
Hemet1
Murrieta1
Ontario1
Rancho Cucamonga1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
DELTA CONSTRUCTION AND DESIGN INC54
Delta Construction and Design Inc1

Common questions

Where does DELTA CONSTRUCTION AND DESIGN INC install solar?

Its installs are spread across 6 counties. The most are in San Bernardino County (26 installs), followed by Riverside County (24).

How often does DELTA CONSTRUCTION AND DESIGN INC install batteries with solar?

100.0% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (41 of 41). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many DELTA CONSTRUCTION AND DESIGN INC installs are under NEM 3.0 (the Net Billing Tariff)?

55 of its 55 interconnected installs (100.0% of the 55 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.