Element Power Systems

How many solar installs has Element Power Systems done in California, and which license number is on its installs?

Element Power Systems has 646 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Nov 29, 2011 to Mar 17, 2026), most of them in Contra Costa County (344), San Joaquin County (167) and Alameda County (91). CSLB lists license 946630 (ELEMENT POWER SYSTEMS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
646
Last 24 months
7
Total capacity
4,488.6 kW DC
Median system size
6.4 kW DC
With battery storage
0.6% all time; 14.3% last 24 months
Third-party owned
0.3% of 646 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
10 installs, latest Mar 5, 2026
Ownership types recorded
lease 2
First install
Nov 29, 2011
Latest install
Mar 17, 2026
Counties
9
Utilities
PGE 646
CSLB license
946630

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201120
201230
201350
2014150
2015230
2016640
2017790
2018860
2019920
2020620
2021560
2022711
2023770
202462
202531
2026 (through Aug 31, 2026)20

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

10 of its 646 interconnected installs (1.5% of the 646 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 30.0% of those include battery storage. The latest Net Billing Tariff install was approved Mar 5, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011317.5%not counted
NEM 2.052381.0%1 (0.2%)
Net Billing Tariff101.5%3 (30.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of Element Power Systems’s installs the utility recorded a third-party ownership type: PPA 0, lease 2, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Element Power Systems exactly.

Third-party owner named on its installsInstalls
SunPower1
SunPower Capital, LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of Element Power Systems’ 7 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 83.3%) used modules recorded as Qcells.

In the last 24 months, 7 of Element Power Systems’ 7 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5, 71.4%) used inverters recorded as Qcells.

In the last 24 months, none of Element Power Systems’ 7 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

3 of 4 battery-paired PG&E and SCE installs (75.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells544
Aptos Solar1not in top list
Sanyo1not in top list
Inverter makerQcells55
Enphase2295
Battery makerEnphase02
SunPower01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 608 of 646 installs, inverters on 646. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
946630ELEMENT POWER SYSTEMS INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorMay 1, 2010May 31, 2027632

License numbers are the ones the utilities recorded on the interconnection applications (634 of 646 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 946630. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Element Power Systems’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018Total
unincorporated Marin County94663011

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Contra Costa344
San Joaquin167
Alameda91
Solano19
Santa Clara17
Stanislaus4
Placer2
Calaveras1
Marin1

Top cities

CityInstalls
Brentwood113
Tracy62
Stockton57
Antioch42
Concord36
Manteca31
Pleasanton29
Oakley26
Livermore21
Dublin17
Danville15
Discovery Bay13
Martinez13
Oakland13
San Ramon13

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ELEMENT POWER SYSTEMS INC296
Element Power Systems291
Element Power Systems, Inc.48
ELEMENT POWER SYSTEMS4
Element Power Systems, Inc4
Element Power Systems Inc.2
Element Power Systems Inc1

Common questions

Where does Element Power Systems install solar?

Its installs are spread across 9 counties. The most are in Contra Costa County (344 installs), followed by San Joaquin County (167).

How often does Element Power Systems install batteries with solar?

0.6% of its interconnected solar installs include battery storage across all years, and 14.3% in the last 24 months (1 of 7).

How many Element Power Systems installs are under NEM 3.0 (the Net Billing Tariff)?

10 of its 646 interconnected installs (1.5% of the 646 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 30.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.