FUSE HVAC REFRIGERATION ELECTRICAL & PLUMBING

How many solar installs has FUSE HVAC REFRIGERATION ELECTRICAL & PLUMBING done in California, and which license number is on its installs?

FUSE HVAC REFRIGERATION ELECTRICAL & PLUMBING has 54 residential solar installs interconnected in California, active in the records from 2022 through 2025 (Oct 13, 2022 to Sep 30, 2025), most of them in Santa Clara County (38), San Mateo County (10) and Alameda County (6). CSLB lists license 1052421 (FUSE HVAC REFRIGERATION ELECTRICAL & PLUMBING) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-8, C-10, C-20, C-36, C-38, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
54
Last 24 months
6
Total capacity
381.8 kW DC
Median system size
6.6 kW DC
With battery storage
5.6% all time; 16.7% last 24 months
Third-party owned
0.0% of 54 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Sep 30, 2025
Ownership types recorded
none recorded
First install
Oct 13, 2022
Latest install
Sep 30, 2025
Counties
3
Utilities
PGE 54
CSLB license
1052421

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202230
2023361
2024131
202521
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 54 interconnected installs (5.6% of the 54 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The latest Net Billing Tariff install was approved Sep 30, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.05194.4%1 (2.0%)
Net Billing Tariff35.6%2 (66.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on FUSE HVAC REFRIGERATION ELECTRICAL & PLUMBING’s installs. No residential system in the file lists a third-party owner name that matches FUSE HVAC REFRIGERATION ELECTRICAL & PLUMBING exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of FUSE HVAC REFRIGERATION ELECTRICAL & PLUMBING’s 6 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 83.3%) used modules recorded as Panasonic.

In the last 24 months, 6 of FUSE HVAC REFRIGERATION ELECTRICAL & PLUMBING’s 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of FUSE HVAC REFRIGERATION ELECTRICAL & PLUMBING’s 6 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

3 of 3 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPanasonic518
Qcells133
Inverter makerEnphase654
Battery makerEnphase13

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 52 of 54 installs, inverters on 54. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1052421FUSE HVAC REFRIGERATION ELECTRICAL & PLUMBING (Corporation)CLEAR, Pending Case/CITB General Building Contractor; C-8; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-38Apr 15, 2019Apr 30, 202754

License numbers are the ones the utilities recorded on the interconnection applications (54 of 54 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1052421. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list FUSE HVAC REFRIGERATION ELECTRICAL & PLUMBING’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20242025Total
City and County of San Francisco1052421112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Santa Clara38
San Mateo10
Alameda6

Top cities

CityInstalls
San Jose23
Sunnyvale4
Fremont3
Morgan Hill3
Redwood City3
Campbell2
Los Altos2
Milpitas2
San Carlos2
San Mateo2
Belmont1
Dublin1
Hayward1
Mountain View1
San Bruno1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
FUSE HVAC REFRIGERATION ELECTRICAL & PLUMBING54

Common questions

Where does FUSE HVAC REFRIGERATION ELECTRICAL & PLUMBING install solar?

Its installs are spread across 3 counties. The most are in Santa Clara County (38 installs), followed by San Mateo County (10).

How often does FUSE HVAC REFRIGERATION ELECTRICAL & PLUMBING install batteries with solar?

5.6% of its interconnected solar installs include battery storage across all years, and 16.7% in the last 24 months (1 of 6).

How many FUSE HVAC REFRIGERATION ELECTRICAL & PLUMBING installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 54 interconnected installs (5.6% of the 54 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.