G&G Electric

How many solar installs has G&G Electric done in California, and which license number is on its installs?

G&G Electric has 38 residential solar installs interconnected in California, active in the records from 2010 through 2016 (Jul 21, 2010 to May 18, 2016), most of them in San Diego County (33), Riverside County (3) and Alameda County (1). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
38
Last 24 months
0
Total capacity
245.6 kW DC
Median system size
5.2 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
21.4% of 14 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 3
First install
Jul 21, 2010
Latest install
May 18, 2016
Counties
4
Utilities
SDGE 33, SCE 3, PGE 2
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201020
201130
201260
201310
2014150
201550
201660
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 38 interconnected installs with a tariff recorded (38) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.038100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 3 of G&G Electric’s installs the utility recorded a third-party ownership type: PPA 0, lease 3, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches G&G Electric exactly.

Third-party owner named on its installsInstalls
NRG Sun Cap LLC2
NRG SUNCAP LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 32 of G&G Electric’s 38 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (16, 50.0%) used modules recorded as LG.

Across all years, 34 of G&G Electric’s 38 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (25, 73.5%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG016
SolarWorld011
Canadian Solar01
Jiangsu Sainty Machinery01
Lumos01
Inverter makerEnphase025
SMA08
PV Powered01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 32 of 38 installs, inverters on 34. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (6 of 38 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
San Diego33
Riverside3
Alameda1
Santa Clara1

Top cities

CityInstalls
San Diego12
El Cajon4
Palm Desert3
Alpine2
Encinitas2
Escondido2
La Mesa2
Coronado1
Cupertino1
Fremont1
La Jolla1
Oceanside1
Poway1
San Marcos1
Santee1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
G&G Electric38

Common questions

Where does G&G Electric install solar?

Its installs are spread across 4 counties. The most are in San Diego County (33 installs), followed by Riverside County (3).

How often does G&G Electric install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many G&G Electric installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 38 interconnected installs with a tariff recorded (38) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.