Gilmore Solar, Heating, & Air

How many solar installs has Gilmore Solar, Heating, & Air done in California, and which license number is on its installs?

Gilmore Solar, Heating, & Air has 55 residential solar installs interconnected in California, active in the records from 2011 through 2016 (Nov 15, 2011 to Sep 20, 2016), most of them in El Dorado County (48), Placer County (4) and Yolo County (2). CSLB lists license 559305 (GILMORE HOME SERVICES) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-20, C-36, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
55
Last 24 months
0
Total capacity
338.6 kW DC
Median system size
5.9 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 55 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Nov 15, 2011
Latest install
Sep 20, 2016
Counties
4
Utilities
PGE 55
CSLB license
559305

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201120
201210
201300
201400
201520
2016500
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 55 interconnected installs with a tariff recorded (55) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.055100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Gilmore Solar, Heating, & Air’s installs. No residential system in the file lists a third-party owner name that matches Gilmore Solar, Heating, & Air exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 55 of Gilmore Solar, Heating, & Air’s 55 installs name a module maker in the “Generator Manufacturer” fields, and most of those (51, 92.7%) used modules recorded as SolarWorld.

Across all years, 55 of Gilmore Solar, Heating, & Air’s 55 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (45, 81.8%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld051
ET Solar Industry, Ltd.02
Green Power01
Qcells01
Inverter makerEnphase045
SolarEdge06
Fronius03
SMA01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 55 of 55 installs, inverters on 55. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
559305GILMORE HOME SERVICES (Limited Liability)CLEARC-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36Mar 6, 1989Sep 30, 202852

License numbers are the ones the utilities recorded on the interconnection applications (52 of 55 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 559305. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
El Dorado48
Placer4
Yolo2
San Joaquin1

Top cities

CityInstalls
Placerville13
Shingle Springs10
El Dorado Hills9
Cameron Park7
El Dorado2
Lincoln2
Rescue2
West Sacramento2
Cool1
Garden Valley1
Georgetown1
Granite Bay1
Newcastle1
Pilot Hill1
Somerset1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Gilmore Solar, Heating, & Air51
Gilmore Solar Heating and Air3
Gilmore Solar, Heating, And Air1

Common questions

Where does Gilmore Solar, Heating, & Air install solar?

Its installs are spread across 4 counties. The most are in El Dorado County (48 installs), followed by Placer County (4).

How often does Gilmore Solar, Heating, & Air install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Gilmore Solar, Heating, & Air installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 55 interconnected installs with a tariff recorded (55) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.