Grounded Electric Inc.

How many solar installs has Grounded Electric Inc. done in California, and which license number is on its installs?

Grounded Electric Inc. has 84 residential solar installs interconnected in California, active in the records from 2016 through 2026 (May 10, 2016 to Apr 6, 2026), most of them in Orange County (76), San Diego County (6) and Los Angeles County (2). CSLB lists license 782387 (GROUNDED ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
84
Last 24 months
5
Total capacity
598.4 kW DC
Median system size
6.6 kW DC
With battery storage
53.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 84 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4 installs, latest Apr 6, 2026
Ownership types recorded
none recorded
Median battery size
11.4 kWh (7 installs list a capacity)
First install
May 10, 2016
Latest install
Apr 6, 2026
Counties
3
Utilities
SDGE 71, SCE 13
CSLB license
782387

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201690
201730
2018100
2019110
2020110
2021102
202281
2023141
202431
202541
2026 (through Aug 31, 2026)11

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4 of its 84 interconnected installs (4.8% of the 84 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Apr 6, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.033.6%not counted
NEM 2.07791.7%5 (45.5%)
Net Billing Tariff44.8%2 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Grounded Electric Inc.’s installs. No residential system in the file lists a third-party owner name that matches Grounded Electric Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of Grounded Electric Inc.’s 5 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 40.0%) used modules recorded as JA Solar.

In the last 24 months, 5 of Grounded Electric Inc.’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of Grounded Electric Inc.’s 5 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as FranklinWH.

6 of 7 battery-paired PG&E and SCE installs (85.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar2not in top list
Enphase1not in top list
Qcells1not in top list
REC1not in top list
UnitedRenewableEnergyCo.,Ltd.111
Inverter makerEnphase546
Battery makerFranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 83 of 84 installs, inverters on 84. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Grounded Electric Inc. as developer on 2 battery storage projects and as installer on 2 (2 name it as both), 2 projects in all with 71 kWh of storage. 1 have the status Paid, with $2,099 in current incentive allocations. Applications were received from Jul 25, 2018 to Apr 5, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid18$2,099
PBI in Process162$15,031

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage162$15,0310$0
Small Residential Storage18$2,0991$2,099

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
782387GROUNDED ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorAug 3, 2000Oct 31, 202784

License numbers are the ones the utilities recorded on the interconnection applications (84 of 84 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 782387. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Grounded Electric Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20192022Total
unincorporated San Diego County782387112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Orange76
San Diego6
Los Angeles2

Top cities

CityInstalls
San Clemente50
San Juan Capo10
Dana Point3
Laguna Niguel2
Buena Park1
Capistrano Bch1
Capistrano Beach1
Cerritos1
Corona del Mar1
Encinitas1
Escondido1
Garden Grove1
Huntington Beach1
Imperial Beach1
Laguna Beach1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Grounded Electric Inc.71
GROUNDED ELECTRIC INC7
GROUNDED ELECTRIC4
Grounded Electric2

Common questions

Where does Grounded Electric Inc. install solar?

Its installs are spread across 3 counties. The most are in Orange County (76 installs), followed by San Diego County (6).

How often does Grounded Electric Inc. install batteries with solar?

53.8% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (2 of 2). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Grounded Electric Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

4 of its 84 interconnected installs (4.8% of the 84 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.