Horizon Energy Systems

How many solar installs has Horizon Energy Systems done in California, and which license number is on its installs?

Horizon Energy Systems has 420 residential solar installs interconnected in California, active in the records from 2004 through 2026 (Jan 14, 2004 to Jan 12, 2026), most of them in Santa Clara County (341), San Mateo County (54) and Alameda County (12). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
420
Last 24 months
1
Total capacity
2,148 kW DC
Median system size
4.4 kW DC
With battery storage
0.2% all time; 100.0% last 24 months
Third-party owned
0.0% of 420 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Jan 12, 2026
Ownership types recorded
none recorded
Median battery size
19.2 kWh (1 installs list a capacity)
First install
Jan 14, 2004
Latest install
Jan 12, 2026
Counties
7
Utilities
PGE 420
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2004 to 2026

YearInstalls interconnectedWith battery storage
2004120
2005100
2006280
2007500
2008560
2009680
2010790
2011520
2012370
2013170
201440
201500
201600
201710
201850
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)11

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 420 interconnected installs (0.2% of the 420 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Jan 12, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.041398.3%not counted
NEM 2.061.4%0 (0.0%)
Net Billing Tariff10.2%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Horizon Energy Systems’s installs. No residential system in the file lists a third-party owner name that matches Horizon Energy Systems exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Horizon Energy Systems’ 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Fortress Power LLC.

In the last 24 months, 1 of Horizon Energy Systems’ 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Fortress Power LLC.

0 of 1 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerFortress Power LLC1not in top list
VSUN (Vietnam Sunergy)1not in top list
Inverter makerFortress Power LLC1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 418 of 420 installs, inverters on 420. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (9 of 420 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
Santa Clara341
San Mateo54
Alameda12
Santa Cruz7
Contra Costa4
El Dorado1
Monterey1

Top cities

CityInstalls
San Jose173
Los Gatos25
Sunnyvale24
Los Altos21
Morgan Hill20
Cupertino17
Mountain View17
Saratoga14
Gilroy13
Menlo Park12
Campbell9
Fremont9
Milpitas7
Redwood City7
San Mateo5

Names as recorded by the utilities

The utilities recorded this installer under 10 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Horizon Energy Systems396
Horizon Energy Systems, Inc.10
Horizon Energy Systems, Inc7
horizon Energy Systems1
Horizon ENergy Systems1
HORIZON ENERGY SYSTEMS1
Horizon Energy Systems Inc1
Horizon Energy Systems Inc.1
HORIZON ENERGY SYSTEMS LLC1
HOrizon Energy Systems, Inc1

Common questions

Where does Horizon Energy Systems install solar?

Its installs are spread across 7 counties. The most are in Santa Clara County (341 installs), followed by San Mateo County (54).

How often does Horizon Energy Systems install batteries with solar?

0.2% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (1 of 1).

How many Horizon Energy Systems installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 420 interconnected installs (0.2% of the 420 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.