Inter Faith Electric & Fire Inc.

How many solar installs has Inter Faith Electric & Fire Inc. done in California, and which license number is on its installs?

Inter Faith Electric & Fire Inc. has 133 residential solar installs interconnected in California, active in the records from 2014 through 2025 (Nov 13, 2014 to Dec 26, 2025), most of them in Kern County (122), Los Angeles County (8) and Orange County (1). CSLB lists license 816967 (INTER FAITH ELECTRIC & FIRE INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
133
Last 24 months
1
Total capacity
1,166.1 kW DC
Median system size
8.1 kW DC
With battery storage
1.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
1.5% of 133 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Dec 26, 2025
Ownership types recorded
PPA 1, lease 1
Median battery size
6 kWh (2 installs list a capacity)
First install
Nov 13, 2014
Latest install
Dec 26, 2025
Counties
5
Utilities
PGE 85, SCE 47, SDGE 1
CSLB license
816967

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201410
2015160
2016510
2017240
201870
2019102
202040
202120
202250
2023110
202410
202510
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 133 interconnected installs (1.5% of the 133 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Dec 26, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.07254.1%not counted
NEM 2.05944.4%2 (3.4%)
Net Billing Tariff21.5%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 2 of Inter Faith Electric & Fire Inc.’s installs the utility recorded a third-party ownership type: PPA 1, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Inter Faith Electric & Fire Inc. exactly.

Third-party owner named on its installsInstalls
Solkraft1
Sun Nova1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Inter Faith Electric & Fire Inc.’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Qcells.

In the last 24 months, 1 of Inter Faith Electric & Fire Inc.’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of Inter Faith Electric & Fire Inc.’s 1 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells118
Inverter makerEnphase16
Battery makersonnen02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 129 of 133 installs, inverters on 133. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
816967INTER FAITH ELECTRIC & FIRE INC (Corporation)CLEARC-10 Electrical ContractorJan 31, 2003Jan 31, 2027132

License numbers are the ones the utilities recorded on the interconnection applications (133 of 133 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 816967. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Kern122
Los Angeles8
Orange1
Riverside1
Tulare1

Top cities

CityInstalls
Bakersfield72
Frazier Park15
Tehachapi9
Delano4
Lebec4
Taft4
Lancaster3
Palmdale2
Shafter2
Wasco2
Weldon2
Bodfish1
Boron1
Buttonwillow1
Calimesa1

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Inter Faith Electric & Fire Inc.62
INTER FAITH ELECTRIC & FIRE INC44
Inter Faith Electric and Fire Inc.23
inter faith electric & fire inc1
inter Faith Electric & Fire Inc1
Inter Faith Electric & Fire Inc1
INTER FAITH ELECTRIC AND FIRE1

Common questions

Where does Inter Faith Electric & Fire Inc. install solar?

Its installs are spread across 5 counties. The most are in Kern County (122 installs), followed by Los Angeles County (8).

How often does Inter Faith Electric & Fire Inc. install batteries with solar?

1.5% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Inter Faith Electric & Fire Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 133 interconnected installs (1.5% of the 133 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.