How many solar installs has LAJOMA CONSTRUCTION INC done in California, and which license number is on its installs?

LAJOMA CONSTRUCTION INC has 110 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Aug 30, 2022 to Aug 28, 2026), most of them in Los Angeles County (106), Orange County (3) and San Bernardino County (1). CSLB lists license 864461 (LAJOMA CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
110
Last 24 months
100
Total capacity
306.3 kW DC
Median system size
2.7 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 110 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
109 installs, latest Aug 28, 2026
Ownership types recorded
none recorded
First install
Aug 30, 2022
Latest install
Aug 28, 2026
Counties
3
Utilities
SCE 110
CSLB license
864461

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202210
202300
2024120
2025380
2026 (through Aug 31, 2026)590

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

109 of its 110 interconnected installs (99.1% of the 110 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.010.9%0 (0.0%)
Net Billing Tariff10999.1%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on LAJOMA CONSTRUCTION INC’s installs. No residential system in the file lists a third-party owner name that matches LAJOMA CONSTRUCTION INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 100 of LAJOMA CONSTRUCTION INC’s 100 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (50, 50.0%) used modules recorded as Hyperion Solar.

In the last 24 months, 100 of LAJOMA CONSTRUCTION INC’s 100 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (100, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyperion Solar5050
United Renewable Energy2534
Hyundai1212
Znshine99
Mate Solar1not in top list
Inverter makerEnphase100109

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 110 of 110 installs, inverters on 110. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
864461LAJOMA CONSTRUCTION INC (Corporation)CLEARB General Building ContractorSep 20, 2005May 31, 2028110

License numbers are the ones the utilities recorded on the interconnection applications (110 of 110 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 864461. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles106
Orange3
San Bernardino1

Top cities

CityInstalls
Los Angeles60
Compton15
Downey9
Bell Gardens6
Pico Rivera6
Huntington Park3
Fullerton2
Long Beach2
Baldwin Park1
Gardena1
Lynwood1
Norwalk1
Orange1
Rancho Cucamonga1
Whittier1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
LAJOMA CONSTRUCTION INC110

Common questions

Where does LAJOMA CONSTRUCTION INC install solar?

Its installs are spread across 3 counties. The most are in Los Angeles County (106 installs), followed by Orange County (3).

How often does LAJOMA CONSTRUCTION INC install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 100).

How many LAJOMA CONSTRUCTION INC installs are under NEM 3.0 (the Net Billing Tariff)?

109 of its 110 interconnected installs (99.1% of the 110 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.