Ledbetter Electric

How many solar installs has Ledbetter Electric done in California, and which license number is on its installs?

Ledbetter Electric has 66 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Dec 23, 2015 to Mar 17, 2026), most of them in Yuba County (38), Sutter County (21) and Amador County (3). CSLB lists license 994171 (LEDBETTER ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
66
Last 24 months
6
Total capacity
680.9 kW DC
Median system size
9.6 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 66 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
6 installs, latest Mar 17, 2026
Ownership types recorded
none recorded
First install
Dec 23, 2015
Latest install
Mar 17, 2026
Counties
7
Utilities
PGE 66
CSLB license
994171

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201510
201620
201750
201800
201940
202080
202170
2022100
2023180
202470
202530
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

6 of its 66 interconnected installs (9.1% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Mar 17, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.034.5%not counted
NEM 2.05786.4%0 (0.0%)
Net Billing Tariff69.1%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Ledbetter Electric’s installs. No residential system in the file lists a third-party owner name that matches Ledbetter Electric exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of Ledbetter Electric’s 6 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (3, 50.0%) used modules recorded as Qcells.

In the last 24 months, 6 of Ledbetter Electric’s 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 100.0%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells334
JinkoSolar26
Canadian Solar115
Inverter makerSolarEdge648

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 61 of 66 installs, inverters on 66. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
994171LEDBETTER ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorJun 28, 2014Sep 30, 202866

License numbers are the ones the utilities recorded on the interconnection applications (66 of 66 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 994171. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Yuba38
Sutter21
Amador3
Butte1
Glenn1
Nevada1
Placer1

Top cities

CityInstalls
Marysville21
Yuba City17
Browns Valley8
Oregon House3
Live Oak2
Smartsville2
Sutter Creek2
Wheatland2
Amador City1
Dobbins1
Elk Creek1
Granite Bay1
Loma Rica1
Olivehurst1
Paradise1

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
LEDBETTER ELECTRIC INC51
Ledbetter Electric8
Ledbetter Electric Inc3
Ledbetter Electric Inc.2
Ledbetter Electric, Inc.2

Common questions

Where does Ledbetter Electric install solar?

Its installs are spread across 7 counties. The most are in Yuba County (38 installs), followed by Sutter County (21).

How often does Ledbetter Electric install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 6).

How many Ledbetter Electric installs are under NEM 3.0 (the Net Billing Tariff)?

6 of its 66 interconnected installs (9.1% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.