Ledbetter Electric
How many solar installs has Ledbetter Electric done in California, and which license number is on its installs?
Ledbetter Electric has 66 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Dec 23, 2015 to Mar 17, 2026), most of them in Yuba County (38), Sutter County (21) and Amador County (3). CSLB lists license 994171 (LEDBETTER ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Sep 30, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 66
- Last 24 months
- 6
- Total capacity
- 680.9 kW DC
- Median system size
- 9.6 kW DC
- With battery storage
- 0.0% all time; 0.0% last 24 months
- Third-party owned
- 0.0% of 66 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 6 installs, latest Mar 17, 2026
- Ownership types recorded
- none recorded
- First install
- Dec 23, 2015
- Latest install
- Mar 17, 2026
- Counties
- 7
- Utilities
- PGE 66
- CSLB license
- 994171
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2015 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2015 | 1 | 0 |
| 2016 | 2 | 0 |
| 2017 | 5 | 0 |
| 2018 | 0 | 0 |
| 2019 | 4 | 0 |
| 2020 | 8 | 0 |
| 2021 | 7 | 0 |
| 2022 | 10 | 0 |
| 2023 | 18 | 0 |
| 2024 | 7 | 0 |
| 2025 | 3 | 0 |
| 2026 (through Aug 31, 2026) | 1 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
6 of its 66 interconnected installs (9.1% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Mar 17, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 3 | 4.5% | not counted |
| NEM 2.0 | 57 | 86.4% | 0 (0.0%) |
| Net Billing Tariff | 6 | 9.1% | 0 (0.0%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on Ledbetter Electric’s installs. No residential system in the file lists a third-party owner name that matches Ledbetter Electric exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 6 of Ledbetter Electric’s 6 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (3, 50.0%) used modules recorded as Qcells.
In the last 24 months, 6 of Ledbetter Electric’s 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 100.0%) used inverters recorded as SolarEdge.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 3 | 34 |
| JinkoSolar | 2 | 6 | |
| Canadian Solar | 1 | 15 | |
| Inverter maker | SolarEdge | 6 | 48 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 61 of 66 installs, inverters on 66. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 994171 | LEDBETTER ELECTRIC INC (Corporation) | CLEAR | C-10 Electrical Contractor | Jun 28, 2014 | Sep 30, 2028 | 66 |
License numbers are the ones the utilities recorded on the interconnection applications (66 of 66 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 994171. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Counties
Top cities
| City | Installs |
|---|---|
| Marysville | 21 |
| Yuba City | 17 |
| Browns Valley | 8 |
| Oregon House | 3 |
| Live Oak | 2 |
| Smartsville | 2 |
| Sutter Creek | 2 |
| Wheatland | 2 |
| Amador City | 1 |
| Dobbins | 1 |
| Elk Creek | 1 |
| Granite Bay | 1 |
| Loma Rica | 1 |
| Olivehurst | 1 |
| Paradise | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| LEDBETTER ELECTRIC INC | 51 |
| Ledbetter Electric | 8 |
| Ledbetter Electric Inc | 3 |
| Ledbetter Electric Inc. | 2 |
| Ledbetter Electric, Inc. | 2 |
Common questions
Where does Ledbetter Electric install solar?
Its installs are spread across 7 counties. The most are in Yuba County (38 installs), followed by Sutter County (21).
How often does Ledbetter Electric install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 6).
How many Ledbetter Electric installs are under NEM 3.0 (the Net Billing Tariff)?
6 of its 66 interconnected installs (9.1% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.