Lifetime Solar

How many solar installs has Lifetime Solar done in California, and which license number is on its installs?

Lifetime Solar has 61 residential solar installs interconnected in California, active in the records from 2010 through 2017 (Nov 1, 2010 to Aug 3, 2017), most of them in Placer County (40), Nevada County (13) and El Dorado County (4). CSLB lists license 582499 (WILLIAMS LIFETIME BUILDERS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
61
Last 24 months
0
Total capacity
501.8 kW DC
Median system size
7.2 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 61 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Nov 1, 2010
Latest install
Aug 3, 2017
Counties
6
Utilities
PGE 61
CSLB license
582499

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201020
201160
201250
201390
201420
2015200
2016120
201750
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 61 interconnected installs with a tariff recorded (61) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05691.8%not counted
NEM 2.058.2%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Lifetime Solar’s installs. Across all installers, 1 residential systems list a third-party owner name that matches Lifetime Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 61 of Lifetime Solar’s 61 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (21, 34.4%) used modules recorded as Qcells.

Across all years, 61 of Lifetime Solar’s 61 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (35, 57.4%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells021
Canadian Solar016
SolarWorld08
Mage Solar05
SunPower05
Inverter makerSolarEdge035
SMA018
SunPower04
Canadian Solar02
Enphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 61 of 61 installs, inverters on 61. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
582499WILLIAMS LIFETIME BUILDERS (Corporation)CLEARB General Building ContractorDec 7, 1989Apr 30, 202837

License numbers are the ones the utilities recorded on the interconnection applications (37 of 61 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 582499. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Placer40
Nevada13
El Dorado4
Napa2
Butte1
Sutter1

Top cities

CityInstalls
Auburn19
Grass Valley7
Colfax6
Meadow Vista6
Penn Valley4
Lincoln3
Applegate2
Granite Bay2
Napa2
Chico1
Cool1
Newcastle1
Pilot Hill1
Placerville1
Rescue1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Lifetime Solar59
lifetime Solar1
LifeTime Solar1

Common questions

Where does Lifetime Solar install solar?

Its installs are spread across 6 counties. The most are in Placer County (40 installs), followed by Nevada County (13).

How often does Lifetime Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Lifetime Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 61 interconnected installs with a tariff recorded (61) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.