LIU'S CONSTRUCTION

How many solar installs has LIU'S CONSTRUCTION done in California, and which license number is on its installs?

LIU'S CONSTRUCTION has 66 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Apr 11, 2014 to Aug 19, 2026), most of them in Santa Clara County (44), Alameda County (19) and San Mateo County (2). CSLB lists license 966503 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
66
Last 24 months
40
Total capacity
494.1 kW DC
Median system size
6.9 kW DC
With battery storage
31.8% all time; 47.5% last 24 months
Third-party owned
0.0% of 66 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
23 installs, latest Aug 19, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (12 installs list a capacity)
First install
Apr 11, 2014
Latest install
Aug 19, 2026
Counties
4
Utilities
PGE 66
CSLB license
966503

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201410
201500
201600
201710
201810
201910
202000
202120
202220
2023152
202452
2025208
2026 (through Aug 31, 2026)189

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

23 of its 66 interconnected installs (34.8% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 65.2% of those include battery storage. The latest Net Billing Tariff install was approved Aug 19, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011.5%not counted
NEM 2.04263.6%6 (14.3%)
Net Billing Tariff2334.8%15 (65.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on LIU'S CONSTRUCTION’s installs. No residential system in the file lists a third-party owner name that matches LIU'S CONSTRUCTION exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 37 of LIU'S CONSTRUCTION’s 40 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (15, 40.5%) used modules recorded as SEG Solar.

In the last 24 months, 40 of LIU'S CONSTRUCTION’s 40 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (17, 42.5%) used inverters recorded as Enphase.

In the last 24 months, 13 of LIU'S CONSTRUCTION’s 40 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (8, 61.5%) used batteries recorded as Tesla.

15 of 21 battery-paired PG&E and SCE installs (71.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSEG Solar1523
Bluesun Solar1010
Seraphim517
EG41not in top list
ET SOLAR POWER HONGKONG LIMITED1not in top list
Inverter makerEnphase1727
Tesla1515
SolarEdge621
EG411
FranklinWH1not in top list
Battery makerTesla88
Enphase35
FranklinWH11
Phasegreen Technology11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 61 of 66 installs, inverters on 66. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
966503Sole owner license (name not shown)CLEAR, WC Susp PendingB General Building Contractor; C-10 Electrical ContractorOct 10, 2011Oct 31, 202765

License numbers are the ones the utilities recorded on the interconnection applications (65 of 66 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 966503. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Santa Clara44
Alameda19
San Mateo2
San Francisco1

Top cities

CityInstalls
Fremont16
San Jose13
Cupertino9
Saratoga7
Sunnyvale6
Mountain View3
Los Altos2
Pleasanton2
Los Altos Hills1
Los Gatos1
Menlo Park1
Milpitas1
Monte Sereno1
Redwood City1
San Francisco1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
LIU'S CONSTRUCTION65
Liu's Construction1

Common questions

Where does LIU'S CONSTRUCTION install solar?

Its installs are spread across 4 counties. The most are in Santa Clara County (44 installs), followed by Alameda County (19).

How often does LIU'S CONSTRUCTION install batteries with solar?

31.8% of its interconnected solar installs include battery storage across all years, and 47.5% in the last 24 months (19 of 40).

How many LIU'S CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

23 of its 66 interconnected installs (34.8% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 65.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.