Mike Airey Custom Homes

How many solar installs has Mike Airey Custom Homes done in California, and which license number is on its installs?

Mike Airey Custom Homes has 36 residential solar installs interconnected in California, active in the records from 2018 through 2023 (Nov 7, 2018 to Jul 27, 2023), most of them in Madera County (27), Fresno County (7) and Kings County (1). The license number recorded on most of its installs, 887460, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
36
Last 24 months
0
Total capacity
303.1 kW DC
Median system size
8.1 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 36 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Nov 7, 2018
Latest install
Jul 27, 2023
Counties
4
Utilities
PGE 35, SCE 1
CSLB license
887460

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201810
201980
202070
202140
202260
2023100
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 36 interconnected installs with a tariff recorded (36) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.036100.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Mike Airey Custom Homes’s installs. No residential system in the file lists a third-party owner name that matches Mike Airey Custom Homes exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 34 of Mike Airey Custom Homes’ 36 installs name a module maker in the “Generator Manufacturer” fields, and most of those (20, 58.8%) used modules recorded as Qcells.

Across all years, 36 of Mike Airey Custom Homes’ 36 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (22, 61.1%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells020
Mission Solar012
Canadian Solar01
REC01
Inverter makerEnphase022
SolarEdge014
Fronius01
Xantrex Technology Inc.01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 34 of 36 installs, inverters on 36. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
887460Not found in the CSLB License Master file pulled Nov 4, 202636

License numbers are the ones the utilities recorded on the interconnection applications (36 of 36 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Madera27
Fresno7
Kings1
Tulare1

Top cities

CityInstalls
Coarsegold14
Oakhurst6
Fresno4
Ahwahnee3
Clovis3
Bass Lake2
Dinuba1
Hanford1
Madera1
O Neals1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MIKE AIREY CUSTOM HOMES29
Mike Airey Custom Homes7

Common questions

Where does Mike Airey Custom Homes install solar?

Its installs are spread across 4 counties. The most are in Madera County (27 installs), followed by Fresno County (7).

How often does Mike Airey Custom Homes install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Mike Airey Custom Homes installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 36 interconnected installs with a tariff recorded (36) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.