Offline Solar, Inc. has 44 residential solar installs interconnected in California, active in the records from 2009 through 2019 (Apr 15, 2009 to Sep 16, 2019), most of them in Mariposa County (17), Madera County (15) and Fresno County (9). CSLB lists license 608035 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
44
Last 24 months
0
Total capacity
236.1 kW DC
Median system size
5.2 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 43 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Apr 15, 2009
Latest install
Sep 16, 2019
Counties
5
Utilities
PGE 42, SCE 2
CSLB license
608035

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200950
201090
201180
201280
201320
201400
201500
2016100
201700
201800
201920
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 44 interconnected installs with a tariff recorded (44) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04295.5%not counted
NEM 2.024.5%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Offline Solar, Inc.’s installs. No residential system in the file lists a third-party owner name that matches Offline Solar, Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 43 of Offline Solar, Inc.’s 44 installs name a module maker in the “Generator Manufacturer” fields, and most of those (24, 55.8%) used modules recorded as Kyocera.

Across all years, 44 of Offline Solar, Inc.’s 44 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (33, 75.0%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerKyocera024
Hyundai010
REC03
Mission Solar02
Astro Power, Inc01
Inverter makerSMA033
Fronius04
Xantrex Technology Inc.04
Enphase01
SolarEdge01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 43 of 44 installs, inverters on 44. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Offline Solar, Inc. as developer on 0 battery storage projects and as installer on 12 (0 name it as both), 12 projects in all with 165 kWh of storage. 8 have the status Paid, with $21,172 in current incentive allocations. Applications were received from Aug 16, 2017 to Jun 24, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid8109$21,172
Cancelled457$14,117

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage10129$27,3177$17,039
Large-Scale Storage237$7,9731$4,133

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
608035Sole owner license (name not shown)CLEARB General Building Contractor; C-10 Electrical ContractorDec 14, 1990Dec 31, 202612

License numbers are the ones the utilities recorded on the interconnection applications (12 of 44 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 608035. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Mariposa17
Madera15
Fresno9
Tulare2
San Luis Obispo1

Top cities

CityInstalls
Mariposa14
North Fork6
Ahwahnee4
Fresno4
Coarsegold3
Auberry2
Catheys Valley2
Clovis2
Ducor1
Lemon Cove1
Midpines1
Oakhurst1
Paso Robles1
Prather1
Raymond1

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Offline Solar, Inc.17
Offline Solar14
Offline Solar, Inc6
Offline Solar Inc2
Offline Solar Inc.2
offline Solar1
Offline solar1
OFFLINE SOLAR INC1

Common questions

Where does Offline Solar, Inc. install solar?

Its installs are spread across 5 counties. The most are in Mariposa County (17 installs), followed by Madera County (15).

How often does Offline Solar, Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Offline Solar, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 44 interconnected installs with a tariff recorded (44) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.