Offline Solar Electric

How many solar installs has Offline Solar Electric done in California, and which license number is on its installs?

Offline Solar Electric has 132 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Jan 15, 2014 to Aug 17, 2026), most of them in Mariposa County (122), Madera County (6) and Fresno County (2). CSLB lists license 608035 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
132
Last 24 months
12
Total capacity
878.5 kW DC
Median system size
6.6 kW DC
With battery storage
15.2% all time; 41.7% last 24 months
Third-party owned
0.8% of 132 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
10 installs, latest Aug 17, 2026
Ownership types recorded
other 1
Median battery size
18.2 kWh (15 installs list a capacity)
First install
Jan 15, 2014
Latest install
Aug 17, 2026
Counties
5
Utilities
PGE 132
CSLB license
608035

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201470
2015130
201680
201770
2018160
2019110
2020165
202193
2022124
2023162
202461
202564
2026 (through Aug 31, 2026)51

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

10 of its 132 interconnected installs (7.6% of the 132 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 40.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 17, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03123.5%not counted
NEM 2.09168.9%13 (14.3%)
Net Billing Tariff107.6%4 (40.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Offline Solar Electric’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches Offline Solar Electric exactly.

Third-party owner named on its installsInstalls
Charles Brand1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 10 of Offline Solar Electric’s 12 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (3, 30.0%) used modules recorded as Hyundai.

In the last 24 months, 12 of Offline Solar Electric’s 12 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (8, 66.7%) used inverters recorded as Sol-Ark.

In the last 24 months, none of Offline Solar Electric’s 12 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

1 of 20 battery-paired PG&E and SCE installs (5.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai349
Shanghai PYTES Energy Co., Ltd.3not in top list
VSUN (Vietnam Sunergy)210
JA Solar1not in top list
Kyocera1not in top list
Inverter makerSol-Ark818
SMA585
SolarEdge115
Battery makerBYD Company01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 112 of 132 installs, inverters on 132. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Offline Solar Electric as developer on 15 battery storage projects and as installer on 3 (3 name it as both), 15 projects in all with 218 kWh of storage. 9 have the status Paid, with $43,108 in current incentive allocations. Applications were received from Aug 16, 2017 to Sep 29, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid9131$43,108
Cancelled687$20,158

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage11144$29,5177$17,039
Large-Scale Storage352$11,8131$4,133
Equity Resiliency122$21,9361$21,936

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
608035Sole owner license (name not shown)CLEARB General Building Contractor; C-10 Electrical ContractorDec 14, 1990Dec 31, 2026130

License numbers are the ones the utilities recorded on the interconnection applications (130 of 132 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 608035. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Mariposa122
Madera6
Fresno2
Merced1
Monterey1

Top cities

CityInstalls
Mariposa95
Catheys Valley15
Midpines6
Ahwahnee2
El Portal2
North Fork2
Oakhurst2
Clovis1
Coulterville1
Hornitos1
La Grange1
Madera1
Merced1
Monterey1
Tollhouse1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Offline Solar Electric77
OFFLINE SOLAR ELECTRIC55

Common questions

Where does Offline Solar Electric install solar?

Its installs are spread across 5 counties. The most are in Mariposa County (122 installs), followed by Madera County (6).

How often does Offline Solar Electric install batteries with solar?

15.2% of its interconnected solar installs include battery storage across all years, and 41.7% in the last 24 months (5 of 12).

How many Offline Solar Electric installs are under NEM 3.0 (the Net Billing Tariff)?

10 of its 132 interconnected installs (7.6% of the 132 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 40.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.