projectECO

How many solar installs has projectECO done in California, and which license number is on its installs?

projectECO has 34 residential solar installs interconnected in California, active in the records from 2017 through 2019 (Jul 13, 2017 to Jan 3, 2019), most of them in San Diego County (34). The license number recorded on most of its installs, 998875, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
34
Last 24 months
0
Total capacity
176.9 kW DC
Median system size
5.1 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 34 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jul 13, 2017
Latest install
Jan 3, 2019
Counties
1
Utilities
SDGE 34
CSLB license
998875

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
2017130
2018200
201910
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 34 interconnected installs with a tariff recorded (34) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.034100.0%not recorded
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on projectECO’s installs. No residential system in the file lists a third-party owner name that matches projectECO exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 33 of projectECO’s 34 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (9, 27.3%) used modules recorded as LG.

Across all years, 34 of projectECO’s 34 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (20, 58.8%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG09
SolarWorld09
JinkoSolar06
Mission Solar05
Hyundai04
Inverter makerEnphase020
SolarEdge014
SMA01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 33 of 34 installs, inverters on 34. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
998875Not found in the CSLB License Master file pulled Nov 4, 202631

License numbers are the ones the utilities recorded on the interconnection applications (34 of 34 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list projectECO’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018Total
unincorporated San Diego County99887511

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego34

Top cities

CityInstalls
San Diego19
Chula Vista4
Santee3
Spring Valley2
Carlsbad1
El Cajon1
Escondido1
La Mesa1
Lemon Grove1
Oceanside1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
projectECO34

Common questions

Where does projectECO install solar?

Its installs are spread across 1 county. The most are in San Diego County (34 installs).

How often does projectECO install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many projectECO installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 34 interconnected installs with a tariff recorded (34) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.