Pure Power Solutions

How many solar installs has Pure Power Solutions done in California, and which license number is on its installs?

Pure Power Solutions has 461 residential solar installs interconnected in California, active in the records from 2002 through 2026 (Aug 21, 2002 to Aug 27, 2026), most of them in Sonoma County (369), Napa County (29) and Mendocino County (21). CSLB lists license 808734 (PURE POWER SOLUTIONS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
461
Last 24 months
52
Total capacity
3,528.5 kW DC
Median system size
6.4 kW DC
With battery storage
23.2% all time; 51.9% last 24 months
Third-party owned
0.0% of 461 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
50 installs, latest Aug 27, 2026
Ownership types recorded
none recorded
Median battery size
27 kWh (31 installs list a capacity)
First install
Aug 21, 2002
Latest install
Aug 27, 2026
Counties
12
Utilities
PGE 460, SCE 1
CSLB license
808734

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2002 to 2026

YearInstalls interconnectedWith battery storage
200210
200300
200400
200500
200620
200770
200810
200980
2010120
201190
201270
2013100
2014290
2015301
2016280
2017182
2018292
2019384
20205533
20213115
2022304
20234914
20242610
20253518
2026 (through Aug 31, 2026)64

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

50 of its 461 interconnected installs (10.8% of the 461 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 58.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.015233.0%not counted
NEM 2.025956.2%75 (29.0%)
Net Billing Tariff5010.8%29 (58.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Pure Power Solutions’s installs. No residential system in the file lists a third-party owner name that matches Pure Power Solutions exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 51 of Pure Power Solutions’ 52 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (21, 41.2%) used modules recorded as Silfab.

In the last 24 months, 52 of Pure Power Solutions’ 52 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (27, 51.9%) used inverters recorded as Enphase.

In the last 24 months, 28 of Pure Power Solutions’ 52 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (19, 67.9%) used batteries recorded as Tesla.

84 of 107 battery-paired PG&E and SCE installs (78.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab2162
Mission Solar15not in top list
REC1248
Hyundai1not in top list
JA Solar1not in top list
Inverter makerEnphase27197
Tesla2371
FranklinWH9not in top list
SolarEdge3134
SMA191
Battery makerTesla1957
FranklinWH99

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 423 of 461 installs, inverters on 461. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Pure Power Solutions as developer on 0 battery storage projects and as installer on 109 (0 name it as both), 109 projects in all with 2,750 kWh of storage. 80 have the status Paid, with $1,150,037 in current incentive allocations. Applications were received from Feb 23, 2016 to Jan 21, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid802,051$1,150,037
Cancelled29699$555,458

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency491,357$1,311,34434$920,642
Small Residential Storage45926$197,85839$165,129
Large-Scale Storage9383$92,3777$64,266
Not stated684$103,9160$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
808734PURE POWER SOLUTIONS (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorMay 30, 2002Sep 30, 2027388

License numbers are the ones the utilities recorded on the interconnection applications (391 of 461 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 808734. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Pure Power Solutions’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820232026Total
unincorporated Marin County8087341124

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Sonoma369
Napa29
Mendocino21
Marin15
Alameda8
San Mateo7
Solano5
Lake3
Contra Costa1
Los Angeles1
San Francisco1
Santa Barbara1

Top cities

CityInstalls
Santa Rosa121
Healdsburg104
Cloverdale27
Windsor26
Geyserville22
Sebastopol17
Petaluma12
Sonoma12
Redwood Valley11
Glen Ellen10
Saint Helena10
Calistoga8
Napa6
Penngrove6
Berkeley5

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PURE POWER SOLUTIONS257
Pure Power Solutions204

Common questions

Where does Pure Power Solutions install solar?

Its installs are spread across 12 counties. The most are in Sonoma County (369 installs), followed by Napa County (29).

How often does Pure Power Solutions install batteries with solar?

23.2% of its interconnected solar installs include battery storage across all years, and 51.9% in the last 24 months (27 of 52).

How many Pure Power Solutions installs are under NEM 3.0 (the Net Billing Tariff)?

50 of its 461 interconnected installs (10.8% of the 461 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 58.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.