RISE ENERGY

How many solar installs has RISE ENERGY done in California, and which license number is on its installs?

RISE ENERGY has 239 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Jul 27, 2020 to Aug 28, 2026), most of them in Humboldt County (148), Mendocino County (75) and Butte County (7). CSLB lists license 973891 (RISE ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
239
Last 24 months
32
Total capacity
3,153.8 kW DC
Median system size
4.9 kW DC
With battery storage
9.2% all time; 34.4% last 24 months
Third-party owned
0.0% of 239 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
19 installs, latest Aug 28, 2026
Ownership types recorded
none recorded
Median battery size
15.1 kWh (8 installs list a capacity)
First install
Jul 27, 2020
Latest install
Aug 28, 2026
Counties
6
Utilities
PGE 239
CSLB license
973891

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202052
2021181
2022701
2023974
2024216
202540
2026 (through Aug 31, 2026)248

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

19 of its 239 interconnected installs (7.9% of the 239 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 63.2% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.022092.1%10 (4.5%)
Net Billing Tariff197.9%12 (63.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on RISE ENERGY’s installs. No residential system in the file lists a third-party owner name that matches RISE ENERGY exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 31 of RISE ENERGY’s 32 installs name a module maker in the “Generator Manufacturer” fields, and most of those (21, 67.7%) used modules recorded as Qcells.

In the last 24 months, 32 of RISE ENERGY’s 32 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (15, 46.9%) used inverters recorded as Tesla.

In the last 24 months, 10 of RISE ENERGY’s 32 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (6, 60.0%) used batteries recorded as Tesla.

19 of 22 battery-paired PG&E and SCE installs (86.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2199
Canadian Solar77
LONGi228
REC1not in top list
Inverter makerTesla1536
Yaskawa Solectria Solar820
Enphase78
SMA1151
Solis (Ginlong)1not in top list
Battery makerTesla613
Enphase44

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 237 of 239 installs, inverters on 239. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names RISE ENERGY as developer on 1 battery storage project and as installer on 11 (1 name it as both), 11 projects in all with 4,511 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Jun 17, 2023 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Reserved10251$224,400
Pending Reservation14,260$3,006,487

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Storage Equity10251$224,4000$0
Residential Solar and Storage Equity - AB 209 Non-POU14,260$3,006,4870$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
973891RISE ENERGY (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorJun 11, 2012Feb 29, 2028239

License numbers are the ones the utilities recorded on the interconnection applications (239 of 239 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 973891. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Humboldt148
Mendocino75
Butte7
Lake7
Contra Costa1
Sonoma1

Top cities

CityInstalls
Fort Bragg69
Arcata63
Eureka29
Mckinleyville16
Samoa9
Chico7
Hoopa7
Ukiah6
Clearlake5
Fortuna5
Trinidad5
Bayside4
Blue Lake4
Kneeland4
Bridgeville1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
RISE ENERGY236
Rise Energy3

Common questions

Where does RISE ENERGY install solar?

Its installs are spread across 6 counties. The most are in Humboldt County (148 installs), followed by Mendocino County (75).

How often does RISE ENERGY install batteries with solar?

9.2% of its interconnected solar installs include battery storage across all years, and 34.4% in the last 24 months (11 of 32).

How many RISE ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

19 of its 239 interconnected installs (7.9% of the 239 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 63.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.