Semper Fidelis Construction Inc.

How many solar installs has Semper Fidelis Construction Inc. done in California, and which license number is on its installs?

Semper Fidelis Construction Inc. has 295 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Sep 28, 2010 to Jul 2, 2026), most of them in Contra Costa County (255), Alameda County (23) and San Francisco County (5). CSLB lists license 948715 (SEMPER FIDELIS CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
295
Last 24 months
5
Total capacity
2,119.8 kW DC
Median system size
6.5 kW DC
With battery storage
1.4% all time; 20.0% last 24 months
Third-party owned
0.0% of 295 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Jul 2, 2026
Ownership types recorded
none recorded
Median battery size
9.7 kWh (1 installs list a capacity)
First install
Sep 28, 2010
Latest install
Jul 2, 2026
Counties
10
Utilities
PGE 295
CSLB license
948715

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
201150
2012100
2013370
2014430
2015391
2016401
2017260
201860
2019140
2020200
2021170
2022200
2023111
202420
202530
2026 (through Aug 31, 2026)11

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 295 interconnected installs (1.0% of the 295 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The latest Net Billing Tariff install was approved Jul 2, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.017559.3%not counted
NEM 2.011739.7%1 (0.9%)
Net Billing Tariff31.0%1 (33.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Semper Fidelis Construction Inc.’s installs. No residential system in the file lists a third-party owner name that matches Semper Fidelis Construction Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of Semper Fidelis Construction Inc.’s 5 installs name a module maker in the “Generator Manufacturer” fields, and most of those (3, 60.0%) used modules recorded as Silfab.

In the last 24 months, 5 of Semper Fidelis Construction Inc.’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 60.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of Semper Fidelis Construction Inc.’s 5 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

2 of 4 battery-paired PG&E and SCE installs (50.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab367
JA Solar2not in top list
Inverter makerEnphase371
SolarEdge289
Battery makerEnphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 293 of 295 installs, inverters on 295. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
948715SEMPER FIDELIS CONSTRUCTION INC (Corporation)CLEARB General Building ContractorJun 14, 2010Jun 30, 2028224

License numbers are the ones the utilities recorded on the interconnection applications (224 of 295 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 948715. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Contra Costa255
Alameda23
San Francisco5
Santa Clara5
San Joaquin2
Lake1
Lassen1
Marin1
San Mateo1
Yolo1

Top cities

CityInstalls
Danville115
Lafayette35
Alamo34
Walnut Creek18
Orinda15
San Ramon9
Concord6
Livermore6
Moraga6
Oakland6
Diablo5
Dublin5
San Francisco5
Pleasant Hill3
Pleasanton3

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Semper Fidelis Construction Inc.97
SEMPER FIDELIS CONSTRUCTION INC78
Semper Fidelis Construction, Inc42
Semper Fidelis Construction Inc41
Semper Fidelis Construction, Inc.19
Semper Fidelis Construction17
semper fidelis construction inc1

Common questions

Where does Semper Fidelis Construction Inc. install solar?

Its installs are spread across 10 counties. The most are in Contra Costa County (255 installs), followed by Alameda County (23).

How often does Semper Fidelis Construction Inc. install batteries with solar?

1.4% of its interconnected solar installs include battery storage across all years, and 20.0% in the last 24 months (1 of 5).

How many Semper Fidelis Construction Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 295 interconnected installs (1.0% of the 295 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.