SOLAR CENTRAL INC

How many solar installs has SOLAR CENTRAL INC done in California, and which license number is on its installs?

SOLAR CENTRAL INC has 61 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Sep 24, 2022 to Feb 11, 2026), most of them in Riverside County (58), San Bernardino County (2) and Los Angeles County (1). CSLB lists license 1051362 (SOLAR CENTRAL INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
61
Last 24 months
8
Total capacity
626.7 kW DC
Median system size
10 kW DC
With battery storage
16.4% all time; 100.0% last 24 months
Third-party owned
0.0% of 61 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
14 installs, latest Feb 11, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (10 installs list a capacity)
First install
Sep 24, 2022
Latest install
Feb 11, 2026
Counties
3
Utilities
SCE 61
CSLB license
1051362

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
2022110
2023390
202432
202577
2026 (through Aug 31, 2026)11

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

14 of its 61 interconnected installs (23.0% of the 61 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those include battery storage. The latest Net Billing Tariff install was approved Feb 11, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04777.0%0 (0.0%)
Net Billing Tariff1423.0%10 (71.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SOLAR CENTRAL INC’s installs. No residential system in the file lists a third-party owner name that matches SOLAR CENTRAL INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 8 of SOLAR CENTRAL INC’s 8 installs name a module maker in the “Generator Manufacturer” fields, and most of those (7, 87.5%) used modules recorded as REC.

In the last 24 months, 8 of SOLAR CENTRAL INC’s 8 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (7, 87.5%) used inverters recorded as Tesla.

In the last 24 months, 8 of SOLAR CENTRAL INC’s 8 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (8, 100.0%) used batteries recorded as Tesla.

10 of 10 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC758
SunPower11
Inverter makerTesla711
Enphase122
Battery makerTesla810

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 61 of 61 installs, inverters on 61. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1051362SOLAR CENTRAL INC (Corporation)CLEARC-46 Solar ContractorMar 15, 2019Mar 31, 202761

License numbers are the ones the utilities recorded on the interconnection applications (61 of 61 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1051362. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SOLAR CENTRAL INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023Total
unincorporated San Diego County105136222

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside58
San Bernardino2
Los Angeles1

Top cities

CityInstalls
Palm Desert34
Rancho Mirage10
Palm Springs4
Desert Hot Springs3
Indian Wells3
Beaumont1
Cathedral City1
Joshua Tree1
Sun City1
Temecula1
Whittier1
Yucca Valley1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLAR CENTRAL INC61

Common questions

Where does SOLAR CENTRAL INC install solar?

Its installs are spread across 3 counties. The most are in Riverside County (58 installs), followed by San Bernardino County (2).

How often does SOLAR CENTRAL INC install batteries with solar?

16.4% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (8 of 8).

How many SOLAR CENTRAL INC installs are under NEM 3.0 (the Net Billing Tariff)?

14 of its 61 interconnected installs (23.0% of the 61 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.