Solar Works

How many solar installs has Solar Works done in California, and which license number is on its installs?

Solar Works has 534 residential solar installs interconnected in California, active in the records from 2002 through 2026 (Jun 14, 2002 to Apr 27, 2026), most of them in Sonoma County (515), Napa County (8) and Marin County (6). The license number recorded on most of its installs, 878231, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
534
Last 24 months
51
Total capacity
3,419 kW DC
Median system size
5.5 kW DC
With battery storage
18.0% all time; 80.4% last 24 months
Third-party owned
0.0% of 534 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
63 installs, latest Apr 6, 2026
Ownership types recorded
none recorded
Median battery size
19.6 kWh (31 installs list a capacity)
First install
Jun 14, 2002
Latest install
Apr 27, 2026
Counties
7
Utilities
PGE 534
CSLB license
878231

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2002 to 2026

YearInstalls interconnectedWith battery storage
200230
2003210
2004240
2005300
2006300
2007430
2008140
200950
2010100
2011120
201220
201350
201410
201540
201670
2017190
2018230
2019341
20203913
20213312
2022517
2023539
20242920
20252618
2026 (through Aug 31, 2026)1616

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

63 of its 534 interconnected installs (11.8% of the 534 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 74.6% of those include battery storage. The latest Net Billing Tariff install was approved Apr 6, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.022041.2%not counted
NEM 2.025147.0%43 (17.1%)
Net Billing Tariff6311.8%47 (74.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Solar Works’s installs. No residential system in the file lists a third-party owner name that matches Solar Works exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 40 of Solar Works’ 51 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (16, 40.0%) used modules recorded as REC.

In the last 24 months, 51 of Solar Works’ 51 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (37, 72.5%) used inverters recorded as Enphase.

In the last 24 months, 33 of Solar Works’ 51 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (12, 36.4%) used batteries recorded as Enphase.

66 of 96 battery-paired PG&E and SCE installs (68.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC1682
Silfab9not in top list
Mission Solar8not in top list
Sharp6not in top list
Hyundai3not in top list
Inverter makerEnphase37144
SMA15173
FranklinWH11not in top list
PointGuard Energy Inc.8not in top list
Fronius555
Battery makerEnphase1232
FranklinWH99
PointGuard Energy Inc.88
Sigenergy33
Tesla1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 466 of 534 installs, inverters on 534. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Solar Works as developer on 0 battery storage projects and as installer on 20 (0 name it as both), 20 projects in all with 323 kWh of storage. 13 have the status Paid, with $138,700 in current incentive allocations. Applications were received from Jun 29, 2020 to May 21, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid13207$138,700
Cancelled7116$116,312

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency15248$241,6508$125,338
Small Residential Storage575$13,3625$13,362

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
878231Not found in the CSLB License Master file pulled Nov 4, 2026335

License numbers are the ones the utilities recorded on the interconnection applications (335 of 534 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Solar Works’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018Total
unincorporated Marin County87823111

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Sonoma515
Napa8
Marin6
Contra Costa2
Alameda1
Lake1
Mendocino1

Top cities

CityInstalls
Sebastopol189
Santa Rosa144
Petaluma26
Sonoma24
Occidental16
Windsor16
Rohnert Park14
Forestville12
Guerneville11
Healdsburg10
Geyserville9
Cloverdale8
Cotati6
Glen Ellen6
Bodega Bay5

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Solar Works280
SOLAR WORKS252
Solar works2

Common questions

Where does Solar Works install solar?

Its installs are spread across 7 counties. The most are in Sonoma County (515 installs), followed by Napa County (8).

How often does Solar Works install batteries with solar?

18.0% of its interconnected solar installs include battery storage across all years, and 80.4% in the last 24 months (41 of 51).

How many Solar Works installs are under NEM 3.0 (the Net Billing Tariff)?

63 of its 534 interconnected installs (11.8% of the 534 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 74.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.