Solarecity Electric

How many solar installs has Solarecity Electric done in California, and which license number is on its installs?

Solarecity Electric has 239 residential solar installs interconnected in California, active in the records from 2004 through 2012 (Feb 25, 2004 to May 22, 2012), most of them in Placer County (134), El Dorado County (50) and Yolo County (26). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
239
Last 24 months
0
Total capacity
1,168.8 kW DC
Median system size
4.5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 239 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Feb 25, 2004
Latest install
May 22, 2012
Counties
12
Utilities
PGE 239
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2004 to 2026

YearInstalls interconnectedWith battery storage
200430
2005170
2006340
2007270
2008160
2009550
2010490
2011290
201290
201300
201400
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 239 interconnected installs with a tariff recorded (239) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0239100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Solarecity Electric’s installs. No residential system in the file lists a third-party owner name that matches Solarecity Electric exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 238 of Solarecity Electric’s 239 installs name a module maker in the “Generator Manufacturer” fields, and most of those (129, 54.2%) used modules recorded as SunPower.

Across all years, 239 of Solarecity Electric’s 239 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (122, 51.0%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower0129
BP Solar092
Sanyo010
Canadian Solar03
Sharp02
Inverter makerSunPower0122
SMA058
Xantrex Technology Inc.031
Fronius014
Enphase09

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 238 of 239 installs, inverters on 239. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (0 of 239 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
Placer134
El Dorado50
Yolo26
Nevada13
Solano4
Yuba4
Alameda2
Amador2
Butte1
Colusa1
San Mateo1
Sutter1

Top cities

CityInstalls
Lincoln48
Rocklin32
Auburn22
Granite Bay19
Placerville13
Davis12
El Dorado Hills11
Grass Valley7
Shingle Springs7
Cameron Park6
West Sacramento6
Nevada City4
Woodland4
Cool3
Loomis3

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Solarecity Electric238
SOLARECITY ELECTRIC1

Common questions

Where does Solarecity Electric install solar?

Its installs are spread across 12 counties. The most are in Placer County (134 installs), followed by El Dorado County (50).

How often does Solarecity Electric install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Solarecity Electric installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 239 interconnected installs with a tariff recorded (239) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.