SONRAY SOLAR INC dba SONRAY CONSTRUCTION

How many solar installs has SONRAY SOLAR INC dba SONRAY CONSTRUCTION done in California, and which license number is on its installs?

SONRAY SOLAR INC dba SONRAY CONSTRUCTION has 36 residential solar installs interconnected in California, active in the records from 2014 through 2015 (Apr 9, 2014 to Jun 29, 2015), most of them in Placer County (9), Yolo County (9) and San Joaquin County (6). CSLB lists license 922628 (SONRAY CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-39, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
36
Last 24 months
0
Total capacity
222.1 kW DC
Median system size
6.2 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 36 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Apr 9, 2014
Latest install
Jun 29, 2015
Counties
7
Utilities
PGE 36
CSLB license
922628

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
2014210
2015150
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 36 interconnected installs with a tariff recorded (36) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.036100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SONRAY SOLAR INC dba SONRAY CONSTRUCTION’s installs. No residential system in the file lists a third-party owner name that matches SONRAY SOLAR INC dba SONRAY CONSTRUCTION exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 36 of SONRAY SOLAR INC dba SONRAY CONSTRUCTION’s 36 installs name a module maker in the “Generator Manufacturer” fields, and most of those (26, 72.2%) used modules recorded as SunPower.

Across all years, 36 of SONRAY SOLAR INC dba SONRAY CONSTRUCTION’s 36 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (28, 77.8%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower026
Qcells08
Astronergy (Chint)01
SolarWorld01
Inverter makerSMA028
Fronius05
Power-One02
Enphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 36 of 36 installs, inverters on 36. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
922628SONRAY CONSTRUCTION (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-39 Roofing ContractorSep 23, 2008Sep 30, 202833

License numbers are the ones the utilities recorded on the interconnection applications (33 of 36 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 922628. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Placer9
Yolo9
San Joaquin6
Solano4
Sutter4
El Dorado3
Yuba1

Top cities

CityInstalls
Davis8
Rocklin3
Yuba City3
Acampo2
El Dorado Hills2
Fairfield2
Lincoln2
Vacaville2
Auburn1
Cameron Park1
Granite Bay1
Live Oak1
Lodi1
Loomis1
Manteca1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SONRAY SOLAR INC dba SONRAY CONSTRUCTION33
Sonray Solar Inc dba Sonray Construction2
SONRAY SOLAR1

Common questions

Where does SONRAY SOLAR INC dba SONRAY CONSTRUCTION install solar?

Its installs are spread across 7 counties. The most are in Placer County (9 installs), followed by Yolo County (9).

How often does SONRAY SOLAR INC dba SONRAY CONSTRUCTION install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many SONRAY SOLAR INC dba SONRAY CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 36 interconnected installs with a tariff recorded (36) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.