Sun's Free Solar

How many solar installs has Sun's Free Solar done in California, and which license number is on its installs?

Sun's Free Solar has 53 residential solar installs interconnected in California, active in the records from 2009 through 2026 (Mar 13, 2009 to Feb 24, 2026), most of them in Alameda County (30), San Mateo County (7) and Contra Costa County (6). CSLB lists license 917560 (SUN'S FREE) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
53
Last 24 months
1
Total capacity
268 kW DC
Median system size
5.1 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 53 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Feb 24, 2026
Ownership types recorded
none recorded
First install
Mar 13, 2009
Latest install
Feb 24, 2026
Counties
7
Utilities
PGE 53
CSLB license
917560

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200930
201030
201140
201240
2013110
201490
201530
201650
201730
201840
201900
202000
202100
202200
202310
202420
202500
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 53 interconnected installs (5.7% of the 53 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Feb 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04381.1%not counted
NEM 2.0713.2%0 (0.0%)
Net Billing Tariff35.7%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sun's Free Solar’s installs. No residential system in the file lists a third-party owner name that matches Sun's Free Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Sun's Free Solar’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as SunPower.

In the last 24 months, 1 of Sun's Free Solar’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower111
Inverter makerEnphase122

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 53 of 53 installs, inverters on 53. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Sun's Free Solar as developer on 12 battery storage projects and as installer on 12 (12 name it as both), 12 projects in all with 184 kWh of storage. 9 have the status Paid, with $24,652 in current incentive allocations. Applications were received from Jul 8, 2020 to Mar 3, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid9132$24,652
Cancelled242$9,846
RRF Rejected110$1,976

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage9115$20,0388$17,472
Large-Scale Storage260$14,4601$7,180
Not stated110$1,9760$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
917560SUN'S FREE (Corporation)CLEARC-10 Electrical ContractorJun 13, 2008Jun 30, 202825

License numbers are the ones the utilities recorded on the interconnection applications (25 of 53 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 917560. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Sun's Free Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202021202220232025Total
City and County of San Francisco917560210131311
unincorporated Marin County91756000200002

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Alameda30
San Mateo7
Contra Costa6
San Francisco6
Marin2
San Luis Obispo1
Santa Clara1

Top cities

CityInstalls
Oakland11
San Francisco6
Piedmont5
Hayward4
Richmond4
Castro Valley3
San Leandro3
Berkeley2
Pacifica2
San Rafael2
Albany1
Foster City1
Lafayette1
Newark1
Redwood City1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sun's Free Solar50
Sun's free Solar1
Sun's Free solar1
SUN'S FREE SOLAR1

Common questions

Where does Sun's Free Solar install solar?

Its installs are spread across 7 counties. The most are in Alameda County (30 installs), followed by San Mateo County (7).

How often does Sun's Free Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).

How many Sun's Free Solar installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 53 interconnected installs (5.7% of the 53 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.