Suns Up Solar

How many solar installs has Suns Up Solar done in California, and which license number is on its installs?

Suns Up Solar has 63 residential solar installs interconnected in California, active in the records from 2009 through 2019 (Oct 8, 2009 to Feb 26, 2019), most of them in Santa Cruz County (50), Santa Clara County (7) and San Benito County (3). CSLB lists license 516934 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
63
Last 24 months
0
Total capacity
365.2 kW DC
Median system size
5.1 kW DC
With battery storage
3.2% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 63 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Oct 8, 2009
Latest install
Feb 26, 2019
Counties
6
Utilities
PGE 63
CSLB license
516934

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200910
201010
201140
201280
201340
201441
201580
201600
2017140
2018181
201910
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 63 interconnected installs with a tariff recorded (63) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03047.6%not counted
NEM 2.03352.4%1 (3.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Suns Up Solar’s installs. No residential system in the file lists a third-party owner name that matches Suns Up Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 63 of Suns Up Solar’s 63 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (29, 46.0%) used modules recorded as LG.

Across all years, 63 of Suns Up Solar’s 63 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (30, 47.6%) used inverters recorded as Enphase.

Across all years, 1 of Suns Up Solar’s 63 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Rolls Battery Engineering.

1 of 2 battery-paired PG&E and SCE installs (50.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG029
Schuco USA LP08
SunPower08
Suniva06
Qcells04
Inverter makerEnphase030
SolarEdge016
SMA09
SunPower05
Power-One03
Battery makerRolls Battery Engineering01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 63 of 63 installs, inverters on 63. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
516934Sole owner license (name not shown)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorAug 27, 1987Mar 31, 202838

License numbers are the ones the utilities recorded on the interconnection applications (41 of 63 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 516934. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Santa Cruz50
Santa Clara7
San Benito3
Contra Costa1
San Mateo1
Yolo1

Top cities

CityInstalls
Santa Cruz25
Aptos8
Soquel6
Watsonville4
Boulder Creek3
Ben Lomond2
Gilroy2
Sunnyvale2
Tres Pinos2
Byron1
Campbell1
Davis1
Felton1
Hollister1
Los Gatos1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Suns Up Solar61
Suns Up Solar dba Putt Construction1
Suns Up Solar,1

Common questions

Where does Suns Up Solar install solar?

Its installs are spread across 6 counties. The most are in Santa Cruz County (50 installs), followed by Santa Clara County (7).

How often does Suns Up Solar install batteries with solar?

3.2% of its interconnected solar installs include battery storage across all years.

How many Suns Up Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 63 interconnected installs with a tariff recorded (63) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.