Vasco Solar Energy
How many solar installs has Vasco Solar Energy done in California, and which license number is on its installs?
Vasco Solar Energy has 162 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Jan 28, 2010 to Aug 18, 2026), most of them in Orange County (129), San Diego County (16) and Los Angeles County (10). CSLB lists license 608260 (VASCO SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Nov 30, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 162
- Last 24 months
- 4
- Total capacity
- 1,256.9 kW DC
- Median system size
- 7.3 kW DC
- With battery storage
- 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
- Third-party owned
- 0.0% of 138 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 5 installs, latest Aug 18, 2026
- Ownership types recorded
- none recorded
- First install
- Jan 28, 2010
- Latest install
- Aug 18, 2026
- Counties
- 5
- Utilities
- SCE 102, SDGE 60
- CSLB license
- 608260
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2010 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2010 | 1 | 0 |
| 2011 | 2 | 0 |
| 2012 | 0 | 0 |
| 2013 | 12 | 0 |
| 2014 | 14 | 0 |
| 2015 | 34 | 0 |
| 2016 | 42 | 0 |
| 2017 | 20 | 0 |
| 2018 | 3 | 0 |
| 2019 | 7 | 0 |
| 2020 | 2 | 0 |
| 2021 | 4 | 0 |
| 2022 | 6 | 0 |
| 2023 | 11 | 0 |
| 2024 | 0 | 0 |
| 2025 | 3 | 0 |
| 2026 (through Aug 31, 2026) | 1 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
5 of its 162 interconnected installs (3.1% of the 162 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 18, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 126 | 77.8% | not counted |
| NEM 2.0 | 31 | 19.1% | not recorded |
| Net Billing Tariff | 5 | 3.1% | not recorded |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on Vasco Solar Energy’s installs. No residential system in the file lists a third-party owner name that matches Vasco Solar Energy exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 4 of Vasco Solar Energy’s 4 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 50.0%) used modules recorded as REC.
In the last 24 months, 4 of Vasco Solar Energy’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 75.0%) used inverters recorded as Enphase.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | REC | 2 | 4 |
| Aptos Solar | 1 | not in top list | |
| Canadian Solar | 1 | not in top list | |
| Inverter maker | Enphase | 3 | 24 |
| SolarEdge | 1 | 65 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 128 of 162 installs, inverters on 162. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 608260 | VASCO SOLAR (Corporation) | CLEAR | C-46 Solar Contractor | Dec 19, 1990 | Nov 30, 2027 | 139 |
License numbers are the ones the utilities recorded on the interconnection applications (139 of 162 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 608260. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- VASCO SOLAR: 320 installs, license 608260
Counties
| County | Installs |
|---|---|
| Orange | 129 |
| San Diego | 16 |
| Los Angeles | 10 |
| San Bernardino | 6 |
| Riverside | 1 |
Top cities
| City | Installs |
|---|---|
| Huntington Beach | 44 |
| San Clemente | 12 |
| Dana Point | 9 |
| Ladera Ranch | 9 |
| San Juan Capo | 9 |
| Laguna Niguel | 7 |
| Costa Mesa | 6 |
| Los Alamitos | 6 |
| Chino Hills | 4 |
| Laguna Hills | 4 |
| Mission Viejo | 4 |
| Orange | 4 |
| Las Flores | 3 |
| Long Beach | 3 |
| Newport Beach | 3 |
Names as recorded by the utilities
The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Vasco Solar Energy | 130 |
| VASCO SOLAR ENERGY | 32 |
Common questions
Where does Vasco Solar Energy install solar?
Its installs are spread across 5 counties. The most are in Orange County (129 installs), followed by San Diego County (16).
How often does Vasco Solar Energy install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many Vasco Solar Energy installs are under NEM 3.0 (the Net Billing Tariff)?
5 of its 162 interconnected installs (3.1% of the 162 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.