How many solar installs has ZAVATTO BROTHERS CONSTRUCTION done in California, and which license number is on its installs?

ZAVATTO BROTHERS CONSTRUCTION has 64 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Apr 18, 2023 to Jul 29, 2026), most of them in San Bernardino County (22), Riverside County (20) and Los Angeles County (10). CSLB lists license 714503 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
64
Last 24 months
55
Total capacity
582.2 kW DC
Median system size
8.3 kW DC
With battery storage
84.4% all time; 92.7% last 24 months
Third-party owned
71.9% of 64 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
56 installs, latest Jul 29, 2026
Ownership types recorded
PPA 46
Median battery size
5 kWh (50 installs list a capacity)
First install
Apr 18, 2023
Latest install
Jul 29, 2026
Counties
9
Utilities
SCE 60, PGE 4
CSLB license
714503

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
202320
20243329
20252320
2026 (through Aug 31, 2026)65

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

56 of its 64 interconnected installs (87.5% of the 64 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.4% of those include battery storage. The latest Net Billing Tariff install was approved Jul 29, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0812.5%0 (0.0%)
Net Billing Tariff5687.5%54 (96.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 46 of ZAVATTO BROTHERS CONSTRUCTION’s installs the utility recorded a third-party ownership type: PPA 46, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches ZAVATTO BROTHERS CONSTRUCTION exactly.

Third-party owner named on its installsInstalls
Solwerks16
Solwerks Power12
Goodleap9
EverBright, LLC3
540 3rd St LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 54 of ZAVATTO BROTHERS CONSTRUCTION’s 55 installs name a module maker in the “Generator Manufacturer” fields, and most of those (37, 68.5%) used modules recorded as Znshine.

In the last 24 months, 55 of ZAVATTO BROTHERS CONSTRUCTION’s 55 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (53, 96.4%) used inverters recorded as Enphase.

In the last 24 months, 51 of ZAVATTO BROTHERS CONSTRUCTION’s 55 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (49, 96.1%) used batteries recorded as Enphase.

54 of 54 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerZnshine3740
Hyperion Solar88
Qcells66
JA Solar33
Canadian Solar1not in top list
Inverter makerEnphase5357
SolarEdge24
Tesla22
Battery makerEnphase4951
Tesla22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 63 of 64 installs, inverters on 64. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
714503Sole owner license (name not shown)CLEARB General Building ContractorOct 30, 1995Mar 31, 202864

License numbers are the ones the utilities recorded on the interconnection applications (64 of 64 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 714503. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list ZAVATTO BROTHERS CONSTRUCTION’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20242025Total
unincorporated San Diego County714503213

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Bernardino22
Riverside20
Los Angeles10
Orange7
El Dorado1
Kern1
Monterey1
Placer1
San Mateo1

Top cities

CityInstalls
Moreno Valley5
San Bernardino4
Victorville4
Fontana3
Hemet3
Lake Elsinore3
Phelan3
Rialto3
Perris2
Adelanto1
Alhambra1
Apple Valley1
Arcadia1
Barstow1
Beaumont1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ZAVATTO BROTHERS CONSTRUCTION64

Common questions

Where does ZAVATTO BROTHERS CONSTRUCTION install solar?

Its installs are spread across 9 counties. The most are in San Bernardino County (22 installs), followed by Riverside County (20).

How often does ZAVATTO BROTHERS CONSTRUCTION install batteries with solar?

84.4% of its interconnected solar installs include battery storage across all years, and 92.7% in the last 24 months (51 of 55).

How many ZAVATTO BROTHERS CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

56 of its 64 interconnected installs (87.5% of the 64 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.