Home solar in ZIP code 94612, California

Service city recorded on most installs: Oakland. County: Alameda County.

How many homes in ZIP code 94612 have solar?

PG&E, SCE and SDG&E interconnected 56 residential solar systems in ZIP code 94612 through Aug 31, 2026, 3 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Oakland, Alameda County, as the service city on 55 of them. GRID Alternatives has the most installs recorded in this ZIP, 28.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
56
Last 24 months
3 (Sep 2024 through Aug 2026)
Capacity
262.1 kW DC
Median system size
2.6 kW DC
Net Billing Tariff (NEM 3.0)
3 installs, 5.4% of those with a tariff recorded
Utility
PGE 56
First install in data
Jul 22, 2005
Latest install in data
Mar 12, 2026

Installs by year

YearInstalls interconnectedWith battery storage
200510
200610
200700
200800
200900
2010160
201120
201200
201310
2014170
201510
201630
201720
201800
201910
202000
202130
202210
202331
202410
202511
2026 (through Aug 31, 2026)21

Battery storage

5.4% of the residential solar installs here include battery storage across all years (3 of 56). In the last 24 months the share was 66.7% (2 of 3).

Net metering tariff

Of the 56 installs with a net metering tariff recorded: NEM 1.0 42 (75.0%), NEM 2.0 11 (19.6%), the Net Billing Tariff (often called NEM 3.0) 3 (5.4%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

10.7% of the 56 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 50 are recorded as not third-party owned. Ownership types recorded: PPA 6.

Installers by installs in 94612

Installers with a page in this index, most installs in this ZIP first. 18 such installers have at least one install here. 1 more installs were by 1 installer names without a page in this index. Counts of connected systems, not a rating.

InstallerInstalls in 94612Last 24 months
GRID Alternatives280
Tesla Energy Operations (formerly SolarCity)70
FREEDOM FOREVER LLC21
Pure Power Solutions20
ROCKIN ROOFERS20
Sun Light and Power20
BETTER EARTH ELECTRIC INC10
BRIGHT ENERGY GROUP LLC11
Free Energy Systems10
Freedom Solar Co10

City and county recorded for 94612

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Oakland55
City: Clovis1
County: Alameda County56

Common questions

How common are home batteries with solar in 94612?

5.4% of the residential solar installs here include battery storage across all years (3 of 56). In the last 24 months the share was 66.7% (2 of 3).

How many solar installs in 94612 are under NEM 3.0?

3 of the 56 installs here with a tariff recorded (5.4%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 94612?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: GRID Alternatives (28), Tesla Energy Operations (formerly SolarCity) (7), FREEDOM FOREVER LLC (2). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.