100 Percent Electric

How many solar installs has 100 Percent Electric done in California, and which license number is on its installs?

100 Percent Electric has 58 residential solar installs interconnected in California, active in the records from 2015 through 2017 (Mar 6, 2015 to Jun 23, 2017), most of them in San Diego County (51), Riverside County (6) and San Bernardino County (1). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
58
Last 24 months
0
Total capacity
310 kW DC
Median system size
4.9 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
67.6% of 34 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 20, other 3
First install
Mar 6, 2015
Latest install
Jun 23, 2017
Counties
3
Utilities
SDGE 51, SCE 7
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
2015410
2016150
201720
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 58 interconnected installs with a tariff recorded (58) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05798.3%not counted
NEM 2.011.7%not recorded
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 23 of 100 Percent Electric’s installs the utility recorded a third-party ownership type: PPA 20, lease 0, prepaid lease 0, other 3. Across all installers, 4 residential systems list a third-party owner name that matches 100 Percent Electric exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Clean Power Finance9
100 Percent Electric4
devert energy4
CPF2
Ygrene2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 55 of 100 Percent Electric’s 58 installs name a module maker in the “Generator Manufacturer” fields, and most of those (31, 56.4%) used modules recorded as Canadian Solar.

Across all years, 58 of 100 Percent Electric’s 58 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (42, 72.4%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar031
LG024
Inverter makerEnphase042
SolarEdge016

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 55 of 58 installs, inverters on 58. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (8 of 58 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
San Diego51
Riverside6
San Bernardino1

Top cities

CityInstalls
San Diego29
Chula Vista8
El Cajon2
Hemet2
National City2
Spring Valley2
Bonita1
La Mesa1
Lakeside1
Lemon Grove1
Murrieta1
Oceanside1
Ontario1
Riverside1
Romoland1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
100 Percent Electric57
100 percent electric1

Common questions

Where does 100 Percent Electric install solar?

Its installs are spread across 3 counties. The most are in San Diego County (51 installs), followed by Riverside County (6).

How often does 100 Percent Electric install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many 100 Percent Electric installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 58 interconnected installs with a tariff recorded (58) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.