360 MANAGEMENT GROUP INC

How many solar installs has 360 MANAGEMENT GROUP INC done in California, and which license number is on its installs?

360 MANAGEMENT GROUP INC has 51 residential solar installs interconnected in California, active in the records from 2017 through 2018 (Sep 7, 2017 to Jun 7, 2018), most of them in Los Angeles County (19), Riverside County (15) and San Bernardino County (6). The license number recorded on most of its installs, 992379, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
51
Last 24 months
0
Total capacity
230 kW DC
Median system size
3.8 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
78.4% of 51 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 2, lease 38
First install
Sep 7, 2017
Latest install
Jun 7, 2018
Counties
7
Utilities
SCE 51
CSLB license
992379

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
2017390
2018120
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 51 interconnected installs with a tariff recorded (51) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.051100.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 40 of 360 MANAGEMENT GROUP INC’s installs the utility recorded a third-party ownership type: PPA 2, lease 38, prepaid lease 0, other 0. Across all installers, 5 residential systems list a third-party owner name that matches 360 MANAGEMENT GROUP INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
sunrun39
sunpower1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 51 of 360 MANAGEMENT GROUP INC’s 51 installs name a module maker in the “Generator Manufacturer” fields, and most of those (40, 78.4%) used modules recorded as REC.

Across all years, 51 of 360 MANAGEMENT GROUP INC’s 51 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (41, 80.4%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC040
Silfab05
LG03
SunPower03
Inverter makerSolarEdge041
Solis (Ginlong)06
ABB03
SMA01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 51 of 51 installs, inverters on 51. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
992379Not found in the CSLB License Master file pulled Nov 4, 202651

License numbers are the ones the utilities recorded on the interconnection applications (51 of 51 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list 360 MANAGEMENT GROUP INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018Total
City and County of San Francisco99237911
unincorporated San Diego County99237911

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles19
Riverside15
San Bernardino6
Tulare5
Ventura3
Orange2
Kings1

Top cities

CityInstalls
Riverside5
Whittier3
Baldwin Park2
Compton2
Fontana2
Littlerock2
Montebello2
Moreno Valley2
Oxnard2
Perris2
Adelanto1
Beaumont1
Carson1
Cathedral City1
Farmersville1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
360 MANAGEMENT GROUP INC51

Common questions

Where does 360 MANAGEMENT GROUP INC install solar?

Its installs are spread across 7 counties. The most are in Los Angeles County (19 installs), followed by Riverside County (15).

How often does 360 MANAGEMENT GROUP INC install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many 360 MANAGEMENT GROUP INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 51 interconnected installs with a tariff recorded (51) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.