Active Solar

How many solar installs has Active Solar done in California, and which license number is on its installs?

Active Solar has 129 residential solar installs interconnected in California, active in the records from 2009 through 2024 (Dec 28, 2009 to Mar 12, 2024), most of them in Orange County (105), Los Angeles County (10) and San Diego County (8). The license number recorded on most of its installs, 993357, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
129
Last 24 months
0
Total capacity
905.7 kW DC
Median system size
6.6 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
5.6% of 107 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 6
First install
Dec 28, 2009
Latest install
Mar 12, 2024
Counties
6
Utilities
SDGE 81, SCE 48
CSLB license
993357, 955900

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200910
201020
201100
201230
201390
2014110
2015180
2016220
2017250
2018130
2019140
202040
202130
202210
202320
202410
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 129 interconnected installs with a tariff recorded (129) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.07155.0%not counted
NEM 2.05845.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 6 of Active Solar’s installs the utility recorded a third-party ownership type: PPA 0, lease 6, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Active Solar exactly.

Third-party owner named on its installsInstalls
SunPower Capital, LLC.3
Sunpower Solar Program 1, LLC2
Chris James1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 118 of Active Solar’s 129 installs name a module maker in the “Generator Manufacturer” fields, and most of those (96, 81.4%) used modules recorded as SunPower.

Across all years, 128 of Active Solar’s 129 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (67, 52.3%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower096
Qcells012
Aleo solar03
Solaria03
Sanyo02
Inverter makerSunPower067
SMA039
Enphase018
Power-One03
ABB01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 118 of 129 installs, inverters on 128. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
993357Not found in the CSLB License Master file pulled Nov 4, 202677
955900Not found in the CSLB License Master file pulled Nov 4, 202611

License numbers are the ones the utilities recorded on the interconnection applications (88 of 129 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Orange105
Los Angeles10
San Diego8
Riverside3
San Bernardino2
Santa Barbara1

Top cities

CityInstalls
San Juan Capo28
San Clemente17
Laguna Niguel14
Dana Point8
Laguna Hills6
Mission Viejo6
Huntington Beach5
Newport Beach4
Avalon3
Laguna Woods3
Long Beach3
Corona del Mar2
Coto de Caza2
Laguna Beach2
Lake Forest2

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Active Solar113
ACTIVE SOLAR INC8
ACTIVE SOLAR5
active Solar2
Active Solar Inc1

Common questions

Where does Active Solar install solar?

Its installs are spread across 6 counties. The most are in Orange County (105 installs), followed by Los Angeles County (10).

How often does Active Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Active Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 129 interconnected installs with a tariff recorded (129) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.