ALLY ELECTRIC

How many solar installs has ALLY ELECTRIC done in California, and which license number is on its installs?

ALLY ELECTRIC has 120 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 30, 2019 to Jul 23, 2026), most of them in Alameda County (72), Contra Costa County (31) and Marin County (5). CSLB lists license 806465 (ALLY ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
120
Last 24 months
43
Total capacity
705.4 kW DC
Median system size
5.9 kW DC
With battery storage
51.7% all time; 79.1% last 24 months
Third-party owned
0.0% of 120 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
40 installs, latest Jun 18, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (30 installs list a capacity)
First install
Oct 30, 2019
Latest install
Jul 23, 2026
Counties
8
Utilities
PGE 120
CSLB license
806465

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201960
202084
2021196
2022124
2023208
20242113
20252017
2026 (through Aug 31, 2026)1410

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

40 of its 120 interconnected installs (33.3% of the 120 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.5% of those include battery storage. The latest Net Billing Tariff install was approved Jun 18, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.08066.7%27 (33.8%)
Net Billing Tariff4033.3%35 (87.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ALLY ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches ALLY ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 40 of ALLY ELECTRIC’s 43 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (17, 42.5%) used modules recorded as Silfab.

In the last 24 months, 43 of ALLY ELECTRIC’s 43 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (26, 60.5%) used inverters recorded as Tesla.

In the last 24 months, 30 of ALLY ELECTRIC’s 43 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (22, 73.3%) used batteries recorded as Tesla.

40 of 62 battery-paired PG&E and SCE installs (64.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab1725
JA Solar1111
LG529
ElectrIQ46
Qcells324
Inverter makerTesla2627
Enphase1566
Darfon Electronics Corp.25
Fronius2not in top list
SunPower2not in top list
Battery makerTesla2222
Enphase813

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 96 of 120 installs, inverters on 120. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
806465ALLY ELECTRIC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorApr 10, 2002Oct 31, 2028120

License numbers are the ones the utilities recorded on the interconnection applications (120 of 120 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 806465. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list ALLY ELECTRIC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20222024Total
City and County of San Francisco806465112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Alameda72
Contra Costa31
Marin5
San Francisco3
San Mateo3
Solano3
Santa Clara2
Yolo1

Top cities

CityInstalls
Berkeley45
Oakland15
Richmond11
El Cerrito9
Albany6
Kensington3
San Francisco3
Fremont2
Orinda2
San Mateo2
Vallejo2
Belvedere1
Burlingame1
Campbell1
Clayton1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ALLY ELECTRIC120

Common questions

Where does ALLY ELECTRIC install solar?

Its installs are spread across 8 counties. The most are in Alameda County (72 installs), followed by Contra Costa County (31).

How often does ALLY ELECTRIC install batteries with solar?

51.7% of its interconnected solar installs include battery storage across all years, and 79.1% in the last 24 months (34 of 43).

How many ALLY ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

40 of its 120 interconnected installs (33.3% of the 120 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.