Ally Electric and Solar Inc

How many solar installs has Ally Electric and Solar Inc done in California, and which license number is on its installs?

Ally Electric and Solar Inc has 96 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Dec 27, 2010 to Feb 3, 2026), most of them in Alameda County (51), Contra Costa County (20) and San Francisco County (6). CSLB lists license 806465 (ALLY ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
96
Last 24 months
4
Total capacity
443.2 kW DC
Median system size
4.2 kW DC
With battery storage
3.1% all time; 50.0% last 24 months
Third-party owned
0.0% of 96 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Sep 12, 2024
Ownership types recorded
none recorded
Median battery size
10.1 kWh (2 installs list a capacity)
First install
Dec 27, 2010
Latest install
Feb 3, 2026
Counties
9
Utilities
PGE 96
CSLB license
806465

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
201120
201270
2013130
2014220
2015150
2016110
201740
2018121
201950
202000
202100
202200
202300
202421
202511
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 96 interconnected installs (2.1% of the 96 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Sep 12, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.07376.0%not counted
NEM 2.02121.9%1 (4.8%)
Net Billing Tariff22.1%1 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Ally Electric and Solar Inc’s installs. No residential system in the file lists a third-party owner name that matches Ally Electric and Solar Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4 of Ally Electric and Solar Inc’s 4 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 50.0%) used modules recorded as Qcells.

In the last 24 months, 4 of Ally Electric and Solar Inc’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 75.0%) used inverters recorded as Tesla.

In the last 24 months, 2 of Ally Electric and Solar Inc’s 4 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as Tesla.

3 of 3 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2not in top list
JA Solar1not in top list
REC1not in top list
SolarWorld127
SunPower131
Inverter makerTesla3not in top list
Enphase227
SMA128
Battery makerTesla22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 95 of 96 installs, inverters on 96. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Ally Electric and Solar Inc as developer on 75 battery storage projects and as installer on 82 (75 name it as both), 82 projects in all with 1,244 kWh of storage. 57 have the status Paid, with $496,544 in current incentive allocations. Applications were received from Jul 1, 2019 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid57814$496,544
Reserved481$145,794
Pending Reservation129$54,600
Cancelled20320$206,447

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage49680$103,07339$78,939
Residential Solar and Storage Equity - AB 209 Non-POU15274$557,7009$296,454
Equity Resiliency14224$216,0237$116,399
Large-Scale Storage340$7,1282$4,752
Residential Storage Equity126$19,4600$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
806465ALLY ELECTRIC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorApr 10, 2002Oct 31, 202874

License numbers are the ones the utilities recorded on the interconnection applications (75 of 96 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 806465. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Ally Electric and Solar Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20222024Total
City and County of San Francisco806465112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Alameda51
Contra Costa20
San Francisco6
Santa Clara6
Marin5
San Mateo3
San Joaquin2
Solano2
Napa1

Top cities

CityInstalls
Berkeley24
Oakland19
Richmond7
San Francisco6
El Cerrito5
Fremont3
Piedmont2
Tiburon2
Tracy2
Alamo1
Albany1
Belmont1
Benicia1
Brentwood1
Burlingame1

Names as recorded by the utilities

The utilities recorded this installer under 16 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Ally Electric and Solar Inc22
ALLY Electric & Solar, Inc.15
Ally Electric And Solar14
Ally Electric & Solar, Inc.11
Ally Electric And Solar Inc8
Ally Electric and Solar Inc.6
Ally Electric and Solar4
Ally Electric & Solar3
ALLY ELECTRIC & SOLAR INC dba ALLY ELECT3
ALLY ELECTRIC & SOLAR INC2
Ally Electric & Solar Inc.2
ALLY Electric & Solar, Inc2
Ally Electric & Solar Inc1
ALLY Electric & Solar Inc1
Ally Electric & Solar, Inc1
Ally electric and solar1

Common questions

Where does Ally Electric and Solar Inc install solar?

Its installs are spread across 9 counties. The most are in Alameda County (51 installs), followed by Contra Costa County (20).

How often does Ally Electric and Solar Inc install batteries with solar?

3.1% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (2 of 4).

How many Ally Electric and Solar Inc installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 96 interconnected installs (2.1% of the 96 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.