ALTADENA ENERGY & SOLAR INC
How many solar installs has ALTADENA ENERGY & SOLAR INC done in California, and which license number is on its installs?
ALTADENA ENERGY & SOLAR INC has 357 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Dec 1, 2015 to Aug 20, 2026), most of them in Los Angeles County (350), Ventura County (3) and Riverside County (2). CSLB lists license 979146 (ALTADENA ENERGY & SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Dec 31, 2026.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 357
- Last 24 months
- 65
- Total capacity
- 3,026.4 kW DC
- Median system size
- 7.7 kW DC
- With battery storage
- 42.0% all time; 80.0% last 24 months
- Third-party owned
- 12.4% of 356 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 73 installs, latest Aug 20, 2026
- Ownership types recorded
- lease 38, prepaid lease 6
- Median battery size
- 10.1 kWh (150 installs list a capacity)
- First install
- Dec 1, 2015
- Latest install
- Aug 20, 2026
- Counties
- 5
- Utilities
- SCE 357
- CSLB license
- 979146
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2015 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2015 | 1 | 0 |
| 2016 | 17 | 0 |
| 2017 | 13 | 2 |
| 2018 | 16 | 2 |
| 2019 | 30 | 11 |
| 2020 | 25 | 11 |
| 2021 | 36 | 16 |
| 2022 | 53 | 13 |
| 2023 | 69 | 23 |
| 2024 | 47 | 28 |
| 2025 | 25 | 23 |
| 2026 (through Aug 31, 2026) | 25 | 21 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
73 of its 357 interconnected installs (20.4% of the 357 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 20, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 25 | 7.0% | not counted |
| NEM 2.0 | 259 | 72.5% | 82 (31.7%) |
| Net Billing Tariff | 73 | 20.4% | 66 (90.4%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 44 of ALTADENA ENERGY & SOLAR INC’s installs the utility recorded a third-party ownership type: PPA 0, lease 38, prepaid lease 6, other 0. Across all installers, 45 residential systems list a third-party owner name that matches ALTADENA ENERGY & SOLAR INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Altadena Energy & Solar LLC | 43 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 65 of ALTADENA ENERGY & SOLAR INC’s 65 installs name a module maker in the “Generator Manufacturer” fields, and most of those (57, 87.7%) used modules recorded as REC.
In the last 24 months, 65 of ALTADENA ENERGY & SOLAR INC’s 65 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (56, 86.2%) used inverters recorded as Enphase.
In the last 24 months, 52 of ALTADENA ENERGY & SOLAR INC’s 65 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (42, 80.8%) used batteries recorded as Enphase.
149 of 150 battery-paired PG&E and SCE installs (99.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | REC | 57 | 127 |
| Meyer Burger | 3 | not in top list | |
| Qcells | 2 | not in top list | |
| Mission Solar | 1 | not in top list | |
| Silfab | 1 | 75 | |
| Inverter maker | Enphase | 56 | 173 |
| Tesla | 6 | 11 | |
| APsystems (Altenergy Power System) | 1 | not in top list | |
| Sol-Ark | 1 | not in top list | |
| Solar City | 1 | not in top list | |
| Battery maker | Enphase | 42 | 103 |
| Tesla | 9 | 12 | |
| Briggs & Stratton, LLC | 1 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 355 of 357 installs, inverters on 357. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names ALTADENA ENERGY & SOLAR INC as developer on 132 battery storage projects and as installer on 18 (17 name it as both), 133 projects in all with 1,550 kWh of storage. 119 have the status Paid, with $346,275 in current incentive allocations. Applications were received from Oct 25, 2013 to Dec 10, 2025.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 119 | 1,341 | $346,275 |
| Reserved | 1 | 19 | $17,500 |
| Pending Reservation | 1 | 13 | $27,300 |
| Cancelled | 8 | 138 | $52,290 |
| RRF Rejected | 4 | 39 | $7,765 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 115 | 1,200 | $255,451 | 111 | $247,743 |
| Equity Resiliency | 8 | 145 | $118,734 | 5 | $66,374 |
| Large-Scale Storage | 4 | 137 | $27,495 | 2 | $17,773 |
| Residential Solar and Storage Equity - AB 209 | 1 | 13 | $27,300 | 0 | $0 |
| Not stated | 5 | 55 | $22,150 | 1 | $14,386 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 979146 | ALTADENA ENERGY & SOLAR INC (Corporation) | CLEAR | C-10 Electrical Contractor; C-46 Solar Contractor | Dec 5, 2012 | Dec 31, 2026 | 357 |
License numbers are the ones the utilities recorded on the interconnection applications (357 of 357 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 979146. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Counties
| County | Installs |
|---|---|
| Los Angeles | 350 |
| Ventura | 3 |
| Riverside | 2 |
| Orange | 1 |
| San Bernardino | 1 |
Top cities
| City | Installs |
|---|---|
| Altadena | 166 |
| Pasadena | 31 |
| La Canada | 25 |
| South Pasadena | 21 |
| San Marino | 16 |
| La Crescenta | 11 |
| Sierra Madre | 11 |
| Arcadia | 9 |
| Monrovia | 9 |
| Santa Monica | 8 |
| San Gabriel | 7 |
| Claremont | 4 |
| La Verne | 4 |
| Flintridge | 3 |
| Glendora | 3 |
Names as recorded by the utilities
The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| ALTADENA ENERGY & SOLAR INC | 332 |
| Altadena Energy & Solar Inc | 21 |
| Altadena Energy & Solar | 2 |
| ALTADENA ENERGY & SOLAR | 1 |
| Altadena Energy & Solar Inc. | 1 |
Common questions
Where does ALTADENA ENERGY & SOLAR INC install solar?
Its installs are spread across 5 counties. The most are in Los Angeles County (350 installs), followed by Ventura County (3).
How often does ALTADENA ENERGY & SOLAR INC install batteries with solar?
42.0% of its interconnected solar installs include battery storage across all years, and 80.0% in the last 24 months (52 of 65).
How many ALTADENA ENERGY & SOLAR INC installs are under NEM 3.0 (the Net Billing Tariff)?
73 of its 357 interconnected installs (20.4% of the 357 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.