ALTADENA ENERGY & SOLAR INC

How many solar installs has ALTADENA ENERGY & SOLAR INC done in California, and which license number is on its installs?

ALTADENA ENERGY & SOLAR INC has 357 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Dec 1, 2015 to Aug 20, 2026), most of them in Los Angeles County (350), Ventura County (3) and Riverside County (2). CSLB lists license 979146 (ALTADENA ENERGY & SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
357
Last 24 months
65
Total capacity
3,026.4 kW DC
Median system size
7.7 kW DC
With battery storage
42.0% all time; 80.0% last 24 months
Third-party owned
12.4% of 356 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
73 installs, latest Aug 20, 2026
Ownership types recorded
lease 38, prepaid lease 6
Median battery size
10.1 kWh (150 installs list a capacity)
First install
Dec 1, 2015
Latest install
Aug 20, 2026
Counties
5
Utilities
SCE 357
CSLB license
979146

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201510
2016170
2017132
2018162
20193011
20202511
20213616
20225313
20236923
20244728
20252523
2026 (through Aug 31, 2026)2521

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

73 of its 357 interconnected installs (20.4% of the 357 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0257.0%not counted
NEM 2.025972.5%82 (31.7%)
Net Billing Tariff7320.4%66 (90.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 44 of ALTADENA ENERGY & SOLAR INC’s installs the utility recorded a third-party ownership type: PPA 0, lease 38, prepaid lease 6, other 0. Across all installers, 45 residential systems list a third-party owner name that matches ALTADENA ENERGY & SOLAR INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Altadena Energy & Solar LLC43

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 65 of ALTADENA ENERGY & SOLAR INC’s 65 installs name a module maker in the “Generator Manufacturer” fields, and most of those (57, 87.7%) used modules recorded as REC.

In the last 24 months, 65 of ALTADENA ENERGY & SOLAR INC’s 65 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (56, 86.2%) used inverters recorded as Enphase.

In the last 24 months, 52 of ALTADENA ENERGY & SOLAR INC’s 65 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (42, 80.8%) used batteries recorded as Enphase.

149 of 150 battery-paired PG&E and SCE installs (99.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC57127
Meyer Burger3not in top list
Qcells2not in top list
Mission Solar1not in top list
Silfab175
Inverter makerEnphase56173
Tesla611
APsystems (Altenergy Power System)1not in top list
Sol-Ark1not in top list
Solar City1not in top list
Battery makerEnphase42103
Tesla912
Briggs & Stratton, LLC11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 355 of 357 installs, inverters on 357. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ALTADENA ENERGY & SOLAR INC as developer on 132 battery storage projects and as installer on 18 (17 name it as both), 133 projects in all with 1,550 kWh of storage. 119 have the status Paid, with $346,275 in current incentive allocations. Applications were received from Oct 25, 2013 to Dec 10, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid1191,341$346,275
Reserved119$17,500
Pending Reservation113$27,300
Cancelled8138$52,290
RRF Rejected439$7,765

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage1151,200$255,451111$247,743
Equity Resiliency8145$118,7345$66,374
Large-Scale Storage4137$27,4952$17,773
Residential Solar and Storage Equity - AB 209113$27,3000$0
Not stated555$22,1501$14,386

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
979146ALTADENA ENERGY & SOLAR INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorDec 5, 2012Dec 31, 2026357

License numbers are the ones the utilities recorded on the interconnection applications (357 of 357 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 979146. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles350
Ventura3
Riverside2
Orange1
San Bernardino1

Top cities

CityInstalls
Altadena166
Pasadena31
La Canada25
South Pasadena21
San Marino16
La Crescenta11
Sierra Madre11
Arcadia9
Monrovia9
Santa Monica8
San Gabriel7
Claremont4
La Verne4
Flintridge3
Glendora3

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ALTADENA ENERGY & SOLAR INC332
Altadena Energy & Solar Inc21
Altadena Energy & Solar2
ALTADENA ENERGY & SOLAR1
Altadena Energy & Solar Inc.1

Common questions

Where does ALTADENA ENERGY & SOLAR INC install solar?

Its installs are spread across 5 counties. The most are in Los Angeles County (350 installs), followed by Ventura County (3).

How often does ALTADENA ENERGY & SOLAR INC install batteries with solar?

42.0% of its interconnected solar installs include battery storage across all years, and 80.0% in the last 24 months (52 of 65).

How many ALTADENA ENERGY & SOLAR INC installs are under NEM 3.0 (the Net Billing Tariff)?

73 of its 357 interconnected installs (20.4% of the 357 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.