BAJA ELECTRIC CONTRACTOR LLC

How many solar installs has BAJA ELECTRIC CONTRACTOR LLC done in California, and which license number is on its installs?

BAJA ELECTRIC CONTRACTOR LLC has 66 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Mar 30, 2022 to Feb 2, 2026), most of them in Kern County (47), Los Angeles County (5) and Riverside County (4). The license number recorded on most of its installs, 1109083, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
66
Last 24 months
26
Total capacity
462.5 kW DC
Median system size
7 kW DC
With battery storage
82.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 87.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
1.5% of 66 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
60 installs, latest Feb 2, 2026
Ownership types recorded
PPA 1
Median battery size
10 kWh (13 installs list a capacity)
First install
Mar 30, 2022
Latest install
Feb 2, 2026
Counties
9
Utilities
PGE 45, SCE 19, SDGE 2
CSLB license
1109083

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202220
202320
20245347
202585
2026 (through Aug 31, 2026)11

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

60 of its 66 interconnected installs (90.9% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.7% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Feb 2, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.069.1%1 (16.7%)
Net Billing Tariff6090.9%52 (89.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of BAJA ELECTRIC CONTRACTOR LLC’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches BAJA ELECTRIC CONTRACTOR LLC exactly.

Third-party owner named on its installsInstalls
Everbright1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 25 of BAJA ELECTRIC CONTRACTOR LLC’s 26 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (8, 32.0%) used modules recorded as Trina Solar.

In the last 24 months, 26 of BAJA ELECTRIC CONTRACTOR LLC’s 26 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (26, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 19 of BAJA ELECTRIC CONTRACTOR LLC’s 26 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (17, 89.5%) used batteries recorded as Enphase.

48 of 53 battery-paired PG&E and SCE installs (90.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerTrina Solar816
Canadian Solar517
Hyundai58
Qcells37
CertainTeed211
Inverter makerEnphase2658
Shenzhen Eternalplanet Energy Pingshan Ltd.210
SolarEdge24
Fronius11
Qcells1not in top list
Battery makerEnphase1738
Shenzhen Eternalplanet Energy Pingshan Ltd.29

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 62 of 66 installs, inverters on 66. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1109083Not found in the CSLB License Master file pulled Nov 4, 202659

License numbers are the ones the utilities recorded on the interconnection applications (66 of 66 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list BAJA ELECTRIC CONTRACTOR LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2024Total
unincorporated San Diego County110908311

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Kern47
Los Angeles5
Riverside4
San Bernardino3
San Diego2
Tulare2
Fresno1
Kings1
Yuba1

Top cities

CityInstalls
Bakersfield38
California City4
Adelanto1
Arvin1
Cathedral City1
Coalinga1
Corcoran1
Delano1
Duarte1
Escondido1
Goshen1
Hemet1
La Mesa1
La Verne1
Lamont1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BAJA ELECTRIC CONTRACTOR LLC57
BAJA ELECTRIC CONTRACTOR7
Baja Electric Contractor2

Common questions

Where does BAJA ELECTRIC CONTRACTOR LLC install solar?

Its installs are spread across 9 counties. The most are in Kern County (47 installs), followed by Los Angeles County (5).

How often does BAJA ELECTRIC CONTRACTOR LLC install batteries with solar?

82.8% of its interconnected solar installs include battery storage across all years, and 87.5% in the last 24 months (21 of 24). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many BAJA ELECTRIC CONTRACTOR LLC installs are under NEM 3.0 (the Net Billing Tariff)?

60 of its 66 interconnected installs (90.9% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.7% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.