Blake, Alvis & Moore Inc

How many solar installs has Blake, Alvis & Moore Inc done in California, and which license number is on its installs?

Blake, Alvis & Moore Inc has 86 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Dec 19, 2014 to Aug 28, 2026), most of them in Fresno County (44), Tulare County (40) and San Luis Obispo County (1). CSLB lists license 914491 (BLAKE ALVIS & MOORE INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
86
Last 24 months
8
Total capacity
958 kW DC
Median system size
10.3 kW DC
With battery storage
4.7% all time; 12.5% last 24 months
Third-party owned
0.0% of 86 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Aug 28, 2026
Ownership types recorded
none recorded
Median battery size
14.6 kWh (2 installs list a capacity)
First install
Dec 19, 2014
Latest install
Aug 28, 2026
Counties
4
Utilities
PGE 50, SCE 36
CSLB license
914491

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201410
201520
201660
201740
201860
2019163
2020100
202190
2022120
202370
202460
202550
2026 (through Aug 31, 2026)21

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 86 interconnected installs (3.5% of the 86 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0910.5%not counted
NEM 2.07486.0%4 (5.4%)
Net Billing Tariff33.5%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Blake, Alvis & Moore Inc’s installs. No residential system in the file lists a third-party owner name that matches Blake, Alvis & Moore Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 8 of Blake, Alvis & Moore Inc’s 8 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6, 75.0%) used modules recorded as Qcells.

In the last 24 months, 8 of Blake, Alvis & Moore Inc’s 8 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (8, 100.0%) used inverters recorded as SolarEdge.

In the last 24 months, 1 of Blake, Alvis & Moore Inc’s 8 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as SolarEdge.

4 of 4 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells610
JA Solar2not in top list
Inverter makerSolarEdge847
Battery makerSolarEdge11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 84 of 86 installs, inverters on 86. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Blake, Alvis & Moore Inc as developer on 3 battery storage projects and as installer on 3 (3 name it as both), 3 projects in all with 25 kWh of storage. 2 have the status Paid, with $4,093 in current incentive allocations. Applications were received from Aug 15, 2019 to Aug 26, 2019.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid217$4,093
Cancelled18$2,099

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage325$6,1912$4,093

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
914491BLAKE ALVIS & MOORE INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorApr 22, 2008Apr 30, 202886

License numbers are the ones the utilities recorded on the interconnection applications (86 of 86 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 914491. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Fresno44
Tulare40
San Luis Obispo1
Santa Clara1

Top cities

CityInstalls
Reedley19
Visalia18
Tulare13
Fresno12
Sanger5
Kingsburg3
Parlier3
Clovis2
Tipton2
Dinuba1
Exeter1
Ivanhoe1
Lindsay1
Orange Cove1
San Martin1

Names as recorded by the utilities

The utilities recorded this installer under 10 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BLAKE ALVIS & MOORE INC58
Blake, Alvis & Moore Inc13
Blake, Alvis & Moore, Inc7
Blake, Alvis, and Moore Inc2
Blake Alvis & Moore1
Blake Alvis & Moore Inc1
BLAKE, ALVIS & MOORE INC.1
Blake, Alvis and Moore Inc1
Blake, Alvis, & Moore Inc1
Blake, Alvis, & Moore, Inc1

Common questions

Where does Blake, Alvis & Moore Inc install solar?

Its installs are spread across 4 counties. The most are in Fresno County (44 installs), followed by Tulare County (40).

How often does Blake, Alvis & Moore Inc install batteries with solar?

4.7% of its interconnected solar installs include battery storage across all years, and 12.5% in the last 24 months (1 of 8).

How many Blake, Alvis & Moore Inc installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 86 interconnected installs (3.5% of the 86 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.