Crane Exteriors Inc

How many solar installs has Crane Exteriors Inc done in California, and which license number is on its installs?

Crane Exteriors Inc has 187 residential solar installs interconnected in California, active in the records from 2010 through 2024 (Jan 4, 2010 to Feb 12, 2024), most of them in Butte County (152), Glenn County (12) and Tehama County (11). CSLB lists license 775265 (CHICO ROOFING CO) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-39, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
187
Last 24 months
0
Total capacity
1,421.1 kW DC
Median system size
6.8 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 187 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jan 4, 2010
Latest install
Feb 12, 2024
Counties
7
Utilities
PGE 187
CSLB license
775265

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201020
201100
201220
201300
201490
2015280
2016190
2017290
2018370
2019560
202030
202100
202210
202300
202410
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 187 interconnected installs with a tariff recorded (187) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06233.2%not counted
NEM 2.012566.8%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Crane Exteriors Inc’s installs. No residential system in the file lists a third-party owner name that matches Crane Exteriors Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 184 of Crane Exteriors Inc’s 187 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (60, 32.6%) used modules recorded as Qcells.

Across all years, 187 of Crane Exteriors Inc’s 187 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (183, 97.9%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells060
Canadian Solar036
Kyocera029
SolarWorld021
LG020
Inverter makerSolarEdge0183
SMA03
Enphase02
Fronius01
SunPower01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 184 of 187 installs, inverters on 187. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
775265CHICO ROOFING CO (Corporation)CLEARB General Building Contractor; C-39 Roofing ContractorFeb 18, 2000Apr 30, 2028180

License numbers are the ones the utilities recorded on the interconnection applications (182 of 187 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 775265. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Butte152
Glenn12
Tehama11
Shasta5
Sutter4
Colusa2
Yuba1

Top cities

CityInstalls
Chico111
Oroville22
Orland8
Paradise8
Red Bluff8
Magalia4
Willows4
Yuba City4
Corning3
Durham3
Cohasset2
Cottonwood2
Anderson1
Colusa1
Fall River Mills1

Names as recorded by the utilities

The utilities recorded this installer under 21 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Crane Exteriors Inc36
Crane Exteriors32
CRANE EXTERIORS30
Crane Exteriors Inc DBA Chico Solar Works19
Crane Exteriors Inc.14
Crane Exteriors Inc. dba Solar Works14
Crane Exteriors, Inc.11
Crane Exteriors Inc. DBA Solar Works9
Crane Exteriors Inc DBA Solar Works7
Crane Exteriors Inc dba Solar Works3
Crane Exteriors Inc./DBA Solar Works2
Crane Exteriors dba1
Crane Exteriors dba Chico Solar Works1
Crane Exteriors Inc DBA Chico ROOFING1
CRANE EXTERIORS INC DBA CHICO ROOFING CO1
Crane Exteriors Inc DBA Solar works1
Crane Exteriors INc DBA Solar Works1
Crane Exteriors Inc, dba Solar Works1
Crane Exteriors inc. DBA Solar Works1
Crane Exteriors Inc/dba Solar Works1
Crane Exteriors Inc/DBA Solar Works1

Common questions

Where does Crane Exteriors Inc install solar?

Its installs are spread across 7 counties. The most are in Butte County (152 installs), followed by Glenn County (12).

How often does Crane Exteriors Inc install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Crane Exteriors Inc installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 187 interconnected installs with a tariff recorded (187) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources