D L C BUILDERS INC

How many solar installs has D L C BUILDERS INC done in California, and which license number is on its installs?

D L C BUILDERS INC has 61 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Sep 1, 2022 to Feb 28, 2026), most of them in Orange County (34) and Los Angeles County (27). CSLB lists license 985517 (D L C BUILDERS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
61
Last 24 months
5
Total capacity
558.2 kW DC
Median system size
8.8 kW DC
With battery storage
1.6% all time; 0.0% last 24 months
Third-party owned
0.0% of 61 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
10.1 kWh (1 installs list a capacity)
First install
Sep 1, 2022
Latest install
Feb 28, 2026
Counties
2
Utilities
SCE 61
CSLB license
985517

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
2022120
2023411
202440
202530
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 61 interconnected installs with a tariff recorded (61) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.061100.0%1 (1.6%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on D L C BUILDERS INC’s installs. No residential system in the file lists a third-party owner name that matches D L C BUILDERS INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of D L C BUILDERS INC’s 5 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used modules recorded as Qcells.

In the last 24 months, 5 of D L C BUILDERS INC’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 60.0%) used inverters recorded as Enphase.

In the last 24 months, none of D L C BUILDERS INC’s 5 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells547
Inverter makerEnphase324
SolarEdge224
Battery makerEnphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 61 of 61 installs, inverters on 61. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
985517D L C BUILDERS INC (Corporation)CLEARB General Building ContractorJul 27, 2013Apr 30, 202760

License numbers are the ones the utilities recorded on the interconnection applications (61 of 61 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 985517. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Orange34
Los Angeles27

Top cities

CityInstalls
Long Beach17
Los Alamitos15
Seal Beach5
Huntington Beach4
Corona del Mar2
Irvine2
Lakewood2
Sierra Madre2
Torrance2
Cypress1
Fullerton1
Garden Grove1
Manhattan Beach1
Orange1
Rolling Hills Estates1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
D L C BUILDERS INC61

Common questions

Where does D L C BUILDERS INC install solar?

Its installs are spread across 2 counties. The most are in Orange County (34 installs), followed by Los Angeles County (27).

How often does D L C BUILDERS INC install batteries with solar?

1.6% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 5).

How many D L C BUILDERS INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 61 interconnected installs with a tariff recorded (61) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.