Earth Wind and Solar, Inc. dba E W S Con

How many solar installs has Earth Wind and Solar, Inc. dba E W S Con done in California, and which license number is on its installs?

Earth Wind and Solar, Inc. dba E W S Con has 80 residential solar installs interconnected in California, active in the records from 2013 through 2019 (Jun 17, 2013 to Sep 27, 2019), most of them in Fresno County (42), Madera County (25) and Merced County (8). The license number recorded on most of its installs, 980646, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
80
Last 24 months
0
Total capacity
589.5 kW DC
Median system size
7 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 80 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jun 17, 2013
Latest install
Sep 27, 2019
Counties
5
Utilities
PGE 77, SCE 2, SDGE 1
CSLB license
980646

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
2013100
2014180
2015190
2016250
201760
201810
201910
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 80 interconnected installs with a tariff recorded (80) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.07290.0%not counted
NEM 2.0810.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Earth Wind and Solar, Inc. dba E W S Con’s installs. No residential system in the file lists a third-party owner name that matches Earth Wind and Solar, Inc. dba E W S Con exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 78 of Earth Wind and Solar, Inc. dba E W S Con’s 80 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (29, 37.2%) used modules recorded as SolarWorld.

Across all years, 80 of Earth Wind and Solar, Inc. dba E W S Con’s 80 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (39, 48.8%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld029
Eoplly New Energy Technology015
Qcells09
Perlight Solar07
Canadian Solar05
Inverter makerSolarEdge039
Enphase014
SMA09
Enecsys07
Solectria Renewables, LLC07

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 78 of 80 installs, inverters on 80. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Earth Wind and Solar, Inc. dba E W S Con as developer on 2 battery storage projects and as installer on 1 (1 name it as both), 2 projects in all with 16 kWh of storage. 1 have the status Paid, with $6,470 in current incentive allocations. Applications were received from Dec 16, 2022 to Jun 19, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid17$6,470
Cancelled110$9,706

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency216$16,1761$6,470

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
980646Not found in the CSLB License Master file pulled Nov 4, 202663

License numbers are the ones the utilities recorded on the interconnection applications (63 of 80 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Fresno42
Madera25
Merced8
Kings4
Orange1

Top cities

CityInstalls
Fresno27
Coarsegold16
Clovis8
Atwater6
Madera5
Hanford3
Merced2
Oakhurst2
Selma2
Squaw Valley2
Ahwahnee1
Auberry1
Fowler1
Lemoore1
North Fork1

Names as recorded by the utilities

The utilities recorded this installer under 21 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Earth Wind and Solar, Inc. dba E W S Con50
Earth Wind and Solar, Inc4
Earth Wind and Solar, Inc dba EWS Constr4
Earth Wind and Solar, Inc.3
Earth Wind & Solar Inc dba EWS Construct2
Earth Wind and Solar, Inc. dba EWS Const2
Earth Wind & Solar1
Earth Wind and Solar Inc1
EARTH WIND AND SOLAR INC1
EARTH WIND AND SOLAR INC dba E W S CONSTRUCTION1
Earth Wind and Solar Inc dba EWS Constru1
Earth Wind and Solar Inc. dba E W S Cons1
Earth Wind and Solar, Inc dba E W S Cons1
Earth WInd and Solar, Inc dba E W S Cons1
Earth Wind and Solar, Inc DBA EWS Constr1
Earth Wind and Solar, Inc. dba E W S Co1
Earth wind and Solar, Inc. dba E W S Con1
Earth Wind and Solar, Inc. DBA E W S Con1
Earth Wind and Solar, Inc. dba E W S Pow1
Earth, Wind & Solar Inc dba EWS Construc1
Earth, Wind, and Solar1

Common questions

Where does Earth Wind and Solar, Inc. dba E W S Con install solar?

Its installs are spread across 5 counties. The most are in Fresno County (42 installs), followed by Madera County (25).

How often does Earth Wind and Solar, Inc. dba E W S Con install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Earth Wind and Solar, Inc. dba E W S Con installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 80 interconnected installs with a tariff recorded (80) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.