Energy Plus

How many solar installs has Energy Plus done in California, and which license number is on its installs?

Energy Plus has 248 residential solar installs interconnected in California, active in the records from 2005 through 2020 (Aug 4, 2005 to Nov 3, 2020), most of them in Los Angeles County (217), Kern County (18) and Ventura County (6). CSLB lists license 736839 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, C-38, C-46, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
248
Last 24 months
0
Total capacity
2,047.2 kW DC
Median system size
7.9 kW DC
With battery storage
0.4% all time; no installs in the last 24 months last 24 months
Third-party owned
46.1% of 228 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 105
Median battery size
14 kWh (1 installs list a capacity)
First install
Aug 4, 2005
Latest install
Nov 3, 2020
Counties
6
Utilities
SCE 245, PGE 3
CSLB license
736839

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2005 to 2026

YearInstalls interconnectedWith battery storage
200510
200600
200740
2008100
2009100
201090
201180
201260
2013200
2014260
201570
2016820
2017610
201821
201910
202010
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 248 interconnected installs with a tariff recorded (248) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.024197.2%not counted
NEM 2.072.8%1 (14.3%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 105 of Energy Plus’s installs the utility recorded a third-party ownership type: PPA 0, lease 105, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Energy Plus exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Eric Wedell65
Sunpower Capital LLC28
Sunpower Solar Program I LLC8
Candice Golding1
Energy Plus1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 151 of Energy Plus’ 248 installs name a module maker in the “Generator Manufacturer” fields, and most of those (144, 95.4%) used modules recorded as SunPower.

Across all years, 248 of Energy Plus’ 248 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (165, 66.5%) used inverters recorded as SunPower.

Across all years, 1 of Energy Plus’ 248 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as sonnen.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower0144
Supreme Solar07
Inverter makerSunPower0165
SMA055
Fronius09
Enphase08
ABB05
Battery makersonnen01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 151 of 248 installs, inverters on 248. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
736839Sole owner license (name not shown)CLEARC-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-38; C-46 Solar ContractorJun 5, 1997Jun 30, 2027241

License numbers are the ones the utilities recorded on the interconnection applications (247 of 248 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 736839. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Energy Plus’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018Total
unincorporated San Diego County73683911

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles217
Kern18
Ventura6
San Bernardino4
San Joaquin2
San Luis Obispo1

Top cities

CityInstalls
Lancaster76
Palmdale60
Santa Clarita19
Castaic16
Rosamond15
Acton8
Pearblossom6
Quartz Hill6
Valencia6
Canyon Country5
Leona Valley3
Newhall3
Simi Valley3
Agoura Hills2
Helendale2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Energy Plus193
ENERGY PLUS55

Common questions

Where does Energy Plus install solar?

Its installs are spread across 6 counties. The most are in Los Angeles County (217 installs), followed by Kern County (18).

How often does Energy Plus install batteries with solar?

0.4% of its interconnected solar installs include battery storage across all years.

How many Energy Plus installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 248 interconnected installs with a tariff recorded (248) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.