LLP Energy Inc.

How many solar installs has LLP Energy Inc. done in California, and which license number is on its installs?

LLP Energy Inc. has 500 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Feb 10, 2014 to Aug 19, 2026), most of them in Los Angeles County (296), San Diego County (82) and Ventura County (49). CSLB lists license 736839 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, C-38, C-46, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
500
Last 24 months
33
Total capacity
4,223.4 kW DC
Median system size
7.6 kW DC
With battery storage
14.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 90.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
26.9% of 498 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
42 installs, latest Aug 19, 2026
Ownership types recorded
PPA 1, lease 117, other 16
Median battery size
13.5 kWh (60 installs list a capacity)
First install
Feb 10, 2014
Latest install
Aug 19, 2026
Counties
13
Utilities
SCE 406, SDGE 84, PGE 10
CSLB license
736839

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201420
2015140
2016850
2017370
2018621
2019920
2020501
2021458
2022425
2023245
20241711
20252221
2026 (through Aug 31, 2026)88

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

42 of its 500 interconnected installs (8.4% of the 500 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.5% of those include battery storage. The latest Net Billing Tariff install was approved Aug 19, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.09418.8%not counted
NEM 2.036472.8%22 (6.2%)
Net Billing Tariff428.4%38 (90.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 134 of LLP Energy Inc.’s installs the utility recorded a third-party ownership type: PPA 1, lease 117, prepaid lease 0, other 16. Across all installers, 80 residential systems list a third-party owner name that matches LLP Energy Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
LLP Energy78
Energy Plus Solar39
SunPower Capital LLC11
SunPower2
Goodleap1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 33 of LLP Energy Inc.’s 33 installs name a module maker in the “Generator Manufacturer” fields, and most of those (20, 60.6%) used modules recorded as Hyundai.

In the last 24 months, 33 of LLP Energy Inc.’s 33 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (26, 78.8%) used inverters recorded as Tesla.

In the last 24 months, 30 of LLP Energy Inc.’s 33 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (28, 93.3%) used batteries recorded as Tesla.

59 of 60 battery-paired PG&E and SCE installs (98.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai2023
SEG Solar3not in top list
SunPower3402
REC210
Sinotec USA2not in top list
Inverter makerTesla2635
Enphase4127
Growatt1not in top list
PointGuard Energy Inc.1not in top list
SolarEdge149
Battery makerTesla2830
PointGuard1not in top list
Stored Energy Inc13

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 492 of 500 installs, inverters on 500. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
736839Sole owner license (name not shown)CLEARC-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-38; C-46 Solar ContractorJun 5, 1997Jun 30, 2027396

License numbers are the ones the utilities recorded on the interconnection applications (410 of 500 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 736839. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list LLP Energy Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018Total
unincorporated San Diego County73683911

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles296
San Diego82
Ventura49
Kern35
San Bernardino25
San Joaquin4
Orange2
Stanislaus2
Alameda1
Lake1
Riverside1
Santa Clara1
Shasta1

Top cities

CityInstalls
Palmdale88
Lancaster86
Simi Valley37
Santa Clarita24
Chula Vista21
San Diego21
California City17
Castaic10
Rosamond10
Valencia10
Acton9
El Cajon9
Canyon Country8
Quartz Hill8
Apple Valley6

Names as recorded by the utilities

The utilities recorded this installer under 10 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ENERGY +256
ENERGY140
LLP Energy Inc.90
Energy Inc3
Energy INC3
Energy-INC3
LLP Energy2
Energy1
Energy, Inc.1
ENERGY, INC.1

Common questions

Where does LLP Energy Inc. install solar?

Its installs are spread across 13 counties. The most are in Los Angeles County (296 installs), followed by San Diego County (82).

How often does LLP Energy Inc. install batteries with solar?

14.4% of its interconnected solar installs include battery storage across all years, and 90.9% in the last 24 months (30 of 33). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many LLP Energy Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

42 of its 500 interconnected installs (8.4% of the 500 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.