ENERGY PLUS AIR INC
How many solar installs has ENERGY PLUS AIR INC done in California, and which license number is on its installs?
ENERGY PLUS AIR INC has 151 residential solar installs interconnected in California, active in the records from 2002 through 2015 (Aug 6, 2002 to Aug 10, 2015), most of them in Los Angeles County (135), Kern County (14) and Tulare County (1). CSLB lists license 736839 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, C-38, C-46, expires Jun 30, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 151
- Last 24 months
- 0
- Total capacity
- 1,068.6 kW DC
- Median system size
- 7 kW DC
- With battery storage
- 0.7% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 62.5% of 80 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- lease 50
- Median battery size
- 6 kWh (1 installs list a capacity)
- First install
- Aug 6, 2002
- Latest install
- Aug 10, 2015
- Counties
- 4
- Utilities
- SCE 151
- CSLB license
- 736839
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2002 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2002 | 1 | 0 |
| 2003 | 0 | 0 |
| 2004 | 3 | 0 |
| 2005 | 3 | 0 |
| 2006 | 5 | 0 |
| 2007 | 5 | 0 |
| 2008 | 1 | 0 |
| 2009 | 3 | 0 |
| 2010 | 3 | 0 |
| 2011 | 5 | 0 |
| 2012 | 21 | 0 |
| 2013 | 27 | 0 |
| 2014 | 31 | 1 |
| 2015 | 43 | 0 |
| 2016 | 0 | 0 |
| 2017 | 0 | 0 |
| 2018 | 0 | 0 |
| 2019 | 0 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 151 interconnected installs with a tariff recorded (151) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 151 | 100.0% | not counted |
| NEM 2.0 | 0 | 0.0% | 0 |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 50 of ENERGY PLUS AIR INC’s installs the utility recorded a third-party ownership type: PPA 0, lease 50, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches ENERGY PLUS AIR INC exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Sunpower Capital LLC | 26 |
| SunPower Solar Program I, LLC | 21 |
| Sun Power Solar Program I LLC | 1 |
| SunPower Capital, LLC c/o Residential Leasing | 1 |
| SunPower Solarprogram I LLC | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 2 of ENERGY PLUS AIR INC’s 151 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used modules recorded as Mitsubishi.
Across all years, 150 of ENERGY PLUS AIR INC’s 151 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (59, 39.3%) used inverters recorded as SMA.
0 of 1 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Mitsubishi | 0 | 1 |
| OutBack Power | 0 | 1 | |
| SunPower | 0 | 1 | |
| Inverter maker | SMA | 0 | 59 |
| SunPower | 0 | 52 | |
| ABB | 0 | 10 | |
| Fronius | 0 | 8 | |
| Xantrex Technology Inc. | 0 | 8 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2 of 151 installs, inverters on 150. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 736839 | Sole owner license (name not shown) | CLEAR | C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-38; C-46 Solar Contractor | Jun 5, 1997 | Jun 30, 2027 | 148 |
License numbers are the ones the utilities recorded on the interconnection applications (150 of 151 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 736839. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list ENERGY PLUS AIR INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | Total |
|---|---|---|---|
| unincorporated San Diego County | 736839 | 1 | 1 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- LLP Energy Inc.: 500 installs, license 736839
- Energy Plus: 248 installs, license 736839
- Energy Plus Solar: 61 installs, license 736839
Counties
| County | Installs |
|---|---|
| Los Angeles | 135 |
| Kern | 14 |
| Tulare | 1 |
| Ventura | 1 |
Top cities
| City | Installs |
|---|---|
| Lancaster | 47 |
| Palmdale | 36 |
| Castaic | 18 |
| Rosamond | 7 |
| Santa Clarita | 7 |
| Acton | 6 |
| Littlerock | 4 |
| California City | 3 |
| Newhall | 3 |
| Quartz Hill | 3 |
| Saugus | 3 |
| Valencia | 3 |
| Canyon Country | 2 |
| Llano | 2 |
| Tehachapi | 2 |
Names as recorded by the utilities
The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| ENERGY PLUS AIR INC | 102 |
| ENERGY PLUS AIR, INC | 28 |
| ENERGY PLUS AIR, | 13 |
| Energy Plus Air, | 6 |
| Energy Plus Air, Inc. DBA Energy Plus | 2 |
Common questions
Where does ENERGY PLUS AIR INC install solar?
Its installs are spread across 4 counties. The most are in Los Angeles County (135 installs), followed by Kern County (14).
How often does ENERGY PLUS AIR INC install batteries with solar?
0.7% of its interconnected solar installs include battery storage across all years.
How many ENERGY PLUS AIR INC installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 151 interconnected installs with a tariff recorded (151) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.