FULL CIRCLE SOLAR

How many solar installs has FULL CIRCLE SOLAR done in California, and which license number is on its installs?

FULL CIRCLE SOLAR has 43 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Jun 7, 2023 to Aug 20, 2026), most of them in Los Angeles County (25), San Bernardino County (7) and Riverside County (6). CSLB lists license 1069657 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
43
Last 24 months
27
Total capacity
235.4 kW DC
Median system size
4.8 kW DC
With battery storage
14.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 23.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 43 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
36 installs, latest Aug 20, 2026
Ownership types recorded
none recorded
Median battery size
5 kWh (6 installs list a capacity)
First install
Jun 7, 2023
Latest install
Aug 20, 2026
Counties
4
Utilities
SCE 42, SDGE 1
CSLB license
1069657

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
2023100
2024102
2025104
2026 (through Aug 31, 2026)130

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

36 of its 43 interconnected installs (83.7% of the 43 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 17.1% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0716.3%0 (0.0%)
Net Billing Tariff3683.7%6 (17.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on FULL CIRCLE SOLAR’s installs. No residential system in the file lists a third-party owner name that matches FULL CIRCLE SOLAR exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 19 of FULL CIRCLE SOLAR’s 27 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (7, 36.8%) used modules recorded as Qcells.

In the last 24 months, 27 of FULL CIRCLE SOLAR’s 27 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (22, 81.5%) used inverters recorded as Enphase.

In the last 24 months, 6 of FULL CIRCLE SOLAR’s 27 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (6, 100.0%) used batteries recorded as Enphase.

6 of 6 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells79
JA Solar44
Aptos Solar34
Bluesun Solar35
LONGi2not in top list
Inverter makerEnphase2233
SolarEdge57
Battery makerEnphase66

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 35 of 43 installs, inverters on 43. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1069657Sole owner license (name not shown)CLEARC-10 Electrical Contractor; C-46 Solar ContractorOct 9, 2020Oct 31, 202843

License numbers are the ones the utilities recorded on the interconnection applications (43 of 43 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1069657. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles25
San Bernardino7
Riverside6
Orange5

Top cities

CityInstalls
Redondo Beach6
Monterey Park4
Corona3
El Monte2
Hermosa Beach2
Long Beach2
Trabuco Canyon2
Upland2
Alhambra1
Buena Park1
Fontana1
Garden Grove1
Glendora1
Huntington Park1
La Puente1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
FULL CIRCLE SOLAR42
Full Circle Solar1

Common questions

Where does FULL CIRCLE SOLAR install solar?

Its installs are spread across 4 counties. The most are in Los Angeles County (25 installs), followed by San Bernardino County (7).

How often does FULL CIRCLE SOLAR install batteries with solar?

14.3% of its interconnected solar installs include battery storage across all years, and 23.1% in the last 24 months (6 of 26). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many FULL CIRCLE SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

36 of its 43 interconnected installs (83.7% of the 43 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 17.1% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.