Golden State Solar Power

How many solar installs has Golden State Solar Power done in California, and which license number is on its installs?

Golden State Solar Power has 115 residential solar installs interconnected in California, active in the records from 2005 through 2024 (Mar 25, 2005 to May 23, 2024), most of them in Kern County (105), Fresno County (4) and Tulare County (3). The license number recorded on most of its installs, 825017, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
115
Last 24 months
0
Total capacity
959.6 kW DC
Median system size
7.4 kW DC
With battery storage
1.7% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 115 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
5250 kWh (1 installs list a capacity)
First install
Mar 25, 2005
Latest install
May 23, 2024
Counties
6
Utilities
PGE 100, SCE 15
CSLB license
825017

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2005 to 2026

YearInstalls interconnectedWith battery storage
200510
200600
200710
200820
200910
201020
201100
201200
201300
201400
201540
201640
201730
2018150
2019300
2020141
202140
2022150
2023180
202411
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 115 interconnected installs with a tariff recorded (115) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01714.8%not counted
NEM 2.09885.2%2 (2.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Golden State Solar Power’s installs. No residential system in the file lists a third-party owner name that matches Golden State Solar Power exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 105 of Golden State Solar Power’s 115 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (47, 44.8%) used modules recorded as Qcells.

Across all years, 115 of Golden State Solar Power’s 115 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (85, 73.9%) used inverters recorded as Enphase.

0 of 2 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells047
United Renewable Energy016
Solaria014
SolarWorld09
LG05
Inverter makerEnphase085
SolarEdge011
SMA010
Sol-Ark04
Fronius03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 105 of 115 installs, inverters on 115. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
825017Not found in the CSLB License Master file pulled Nov 4, 2026107

License numbers are the ones the utilities recorded on the interconnection applications (108 of 115 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Kern105
Fresno4
Tulare3
Los Angeles1
San Bernardino1
San Luis Obispo1

Top cities

CityInstalls
Bakersfield89
Ridgecrest5
Fresno4
Shafter4
Tehachapi2
Visalia2
Apple Valley1
Edwards1
Frazier Park1
Inyokern1
Lancaster1
Lindsay1
Paso Robles1
Taft1
Wasco1

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GOLDEN STATE SOLAR POWER INC64
Golden State Solar Power36
Golden State Solar Power Inc6
Golden State Solar Power, Inc.4
golden state solar power inc2
golden state solar power1
Golden State Solar Power, Inc1
Golden state solar power, inc.1

Common questions

Where does Golden State Solar Power install solar?

Its installs are spread across 6 counties. The most are in Kern County (105 installs), followed by Fresno County (4).

How often does Golden State Solar Power install batteries with solar?

1.7% of its interconnected solar installs include battery storage across all years.

How many Golden State Solar Power installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 115 interconnected installs with a tariff recorded (115) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.