How many solar installs has Good Energy Renewables done in California, and which license number is on its installs?

Good Energy Renewables has 246 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Feb 18, 2015 to Jun 1, 2026), most of them in Santa Barbara County (219), Ventura County (22) and Tulare County (3). CSLB lists license 988879 (GOOD ENERGY RENEWABLES INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
246
Last 24 months
30
Total capacity
1,690.7 kW DC
Median system size
5.9 kW DC
With battery storage
31.3% all time; 63.3% last 24 months
Third-party owned
0.4% of 245 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
35 installs, latest Jun 1, 2026
Ownership types recorded
lease 1
Median battery size
13.5 kWh (76 installs list a capacity)
First install
Feb 18, 2015
Latest install
Jun 1, 2026
Counties
4
Utilities
SCE 241, PGE 5
CSLB license
988879

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201590
2016190
2017180
2018212
2019163
20201710
2021177
20222911
20235416
20242213
20251512
2026 (through Aug 31, 2026)93

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

35 of its 246 interconnected installs (14.2% of the 246 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 65.7% of those include battery storage. The latest Net Billing Tariff install was approved Jun 1, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04116.7%not counted
NEM 2.017069.1%52 (30.6%)
Net Billing Tariff3514.2%23 (65.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Good Energy Renewables’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Good Energy Renewables exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
GOOD ENERGY RENEWABLES INC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 30 of Good Energy Renewables’ 30 installs name a module maker in the “Generator Manufacturer” fields, and most of those (16, 53.3%) used modules recorded as REC.

In the last 24 months, 30 of Good Energy Renewables’ 30 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (12, 40.0%) used inverters recorded as Enphase.

In the last 24 months, 19 of Good Energy Renewables’ 30 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (16, 84.2%) used batteries recorded as Tesla.

71 of 77 battery-paired PG&E and SCE installs (92.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC1657
SunPower9168
Silfab23
Canadian Solar12
Lumos1not in top list
Inverter makerEnphase1267
Tesla918
SunPower887
SMA120
Battery makerTesla1639
FranklinWH33

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 243 of 246 installs, inverters on 246. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Good Energy Renewables as developer on 2 battery storage projects and as installer on 1 (1 name it as both), 2 projects in all with 17 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Dec 14, 2018 to Jun 17, 2020.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled217$4,613

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage217$4,6130$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
988879GOOD ENERGY RENEWABLES INC (Corporation)CLEARC-10 Electrical ContractorDec 4, 2013Dec 31, 2027245

License numbers are the ones the utilities recorded on the interconnection applications (246 of 246 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 988879. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Santa Barbara219
Ventura22
Tulare3
Los Angeles2

Top cities

CityInstalls
Santa Barbara181
Goleta22
Ojai14
Carpinteria9
Camarillo4
Santa Ynez3
Springville3
Ventura3
Buellton1
Hidden Hills1
Long Beach1
Montecito1
Oxnard1
Solvang1
Summerland1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GOOD ENERGY RENEWABLES INC169
Good Energy Renewables71
GOOD ENERGY RENEWABLES5
Good Energy Renewables, Inc.1

Common questions

Where does Good Energy Renewables install solar?

Its installs are spread across 4 counties. The most are in Santa Barbara County (219 installs), followed by Ventura County (22).

How often does Good Energy Renewables install batteries with solar?

31.3% of its interconnected solar installs include battery storage across all years, and 63.3% in the last 24 months (19 of 30).

How many Good Energy Renewables installs are under NEM 3.0 (the Net Billing Tariff)?

35 of its 246 interconnected installs (14.2% of the 246 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 65.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.