Green Leaf Solar & Electric, Inc.

How many solar installs has Green Leaf Solar & Electric, Inc. done in California, and which license number is on its installs?

Green Leaf Solar & Electric, Inc. has 115 residential solar installs interconnected in California, active in the records from 2009 through 2026 (Dec 11, 2009 to Jun 10, 2026), most of them in Santa Clara County (74), Alameda County (15) and Marin County (5). CSLB lists license 855672 (GREEN LEAF SOLAR & ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
115
Last 24 months
32
Total capacity
813.1 kW DC
Median system size
6.5 kW DC
With battery storage
23.5% all time; 78.1% last 24 months
Third-party owned
0.0% of 115 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
30 installs, latest Jun 10, 2026
Ownership types recorded
none recorded
Median battery size
14.2 kWh (22 installs list a capacity)
First install
Dec 11, 2009
Latest install
Jun 10, 2026
Counties
14
Utilities
PGE 113, SCE 2
CSLB license
855672

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200910
201020
201110
201200
201330
201480
201540
201680
201710
201830
201990
202050
202150
202261
2023161
2024172
20251311
2026 (through Aug 31, 2026)1312

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

30 of its 115 interconnected installs (26.1% of the 115 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 60.0% of those include battery storage. The latest Net Billing Tariff install was approved Jun 10, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03127.0%not counted
NEM 2.05447.0%5 (9.3%)
Net Billing Tariff3026.1%18 (60.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Green Leaf Solar & Electric, Inc.’s installs. No residential system in the file lists a third-party owner name that matches Green Leaf Solar & Electric, Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 30 of Green Leaf Solar & Electric, Inc.’s 32 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (10, 33.3%) used modules recorded as Shenzhen GSL Energy Co., Ltd..

In the last 24 months, 32 of Green Leaf Solar & Electric, Inc.’s 32 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (8, 25.0%) used inverters recorded as Sol-Ark.

In the last 24 months, 2 of Green Leaf Solar & Electric, Inc.’s 32 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used batteries recorded as FranklinWH.

2 of 27 battery-paired PG&E and SCE installs (7.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerShenzhen GSL Energy Co., Ltd.10not in top list
Phono Solar Technology718
Power Center5not in top list
REC5not in top list
Axitec412
Inverter makerSol-Ark822
EG477
Enphase730
Power Center6not in top list
Fronius2not in top list
Battery makerFranklinWH11
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 110 of 115 installs, inverters on 115. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Green Leaf Solar & Electric, Inc. as developer on 0 battery storage projects and as installer on 5 (0 name it as both), 5 projects in all with 12,875 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Oct 14, 2021 to Jun 26, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Reserved2710$674,638
Cancelled312,165$4,783,581

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Non-Residential Storage Equity38,347$4,295,3390$0
Equity Resiliency1473$473,4300$0
Large-Scale Storage14,055$689,4500$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
855672GREEN LEAF SOLAR & ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorMar 12, 2005Jul 31, 2028104

License numbers are the ones the utilities recorded on the interconnection applications (104 of 115 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 855672. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Green Leaf Solar & Electric, Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20192022Total
City and County of San Francisco855672505
unincorporated San Diego County855672011

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Santa Clara74
Alameda15
Marin5
Contra Costa4
San Mateo4
Monterey3
Fresno2
Riverside2
El Dorado1
Madera1
Mendocino1
San Joaquin1
Santa Cruz1
Solano1

Top cities

CityInstalls
San Jose40
Morgan Hill6
Campbell5
Cupertino5
Los Altos4
Fremont3
Milpitas3
Oakland3
Pleasanton3
Saratoga3
Sunnyvale3
Tiburon3
Los Altos Hills2
Los Gatos2
Murrieta2

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GREEN LEAF SOLAR & ELECTRIC INC77
Green Leaf Solar & Electric, Inc.16
Green Leaf Solar & Electric15
Green Leaf Solar & Electric, Inc3
Green Leaf Solar and Electric, Inc2
GREEN LEAF SOLAR & ELECTRIC, INC.1
GREEN LEAF SOLAR AND ELECTRIC INC1

Common questions

Where does Green Leaf Solar & Electric, Inc. install solar?

Its installs are spread across 14 counties. The most are in Santa Clara County (74 installs), followed by Alameda County (15).

How often does Green Leaf Solar & Electric, Inc. install batteries with solar?

23.5% of its interconnected solar installs include battery storage across all years, and 78.1% in the last 24 months (25 of 32).

How many Green Leaf Solar & Electric, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

30 of its 115 interconnected installs (26.1% of the 115 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 60.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.