GREEN LINE SOLAR & ENERGY STORAGE

How many solar installs has GREEN LINE SOLAR & ENERGY STORAGE done in California, and which license number is on its installs?

GREEN LINE SOLAR & ENERGY STORAGE has 43 residential solar installs interconnected in California, active in the records from 2022 through 2026 (May 9, 2022 to Jun 23, 2026), most of them in Sonoma County (18), Marin County (8) and Contra Costa County (4). CSLB lists license 1075546 (GREEN LINE SOLAR & ENERGY STORAGE) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
43
Last 24 months
25
Total capacity
489.5 kW DC
Median system size
9.7 kW DC
With battery storage
55.8% all time; 76.0% last 24 months
Third-party owned
0.0% of 43 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
14 installs, latest Jun 3, 2026
Ownership types recorded
none recorded
Median battery size
27 kWh (15 installs list a capacity)
First install
May 9, 2022
Latest install
Jun 23, 2026
Counties
10
Utilities
PGE 43
CSLB license
1075546

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202222
2023131
202475
2025129
2026 (through Aug 31, 2026)97

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

14 of its 43 interconnected installs (32.6% of the 43 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 85.7% of those include battery storage. The latest Net Billing Tariff install was approved Jun 3, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.02967.4%12 (41.4%)
Net Billing Tariff1432.6%12 (85.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on GREEN LINE SOLAR & ENERGY STORAGE’s installs. No residential system in the file lists a third-party owner name that matches GREEN LINE SOLAR & ENERGY STORAGE exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 24 of GREEN LINE SOLAR & ENERGY STORAGE’s 25 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (11, 45.8%) used modules recorded as Qcells.

In the last 24 months, 25 of GREEN LINE SOLAR & ENERGY STORAGE’s 25 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (11, 44.0%) used inverters recorded as Enphase.

In the last 24 months, 18 of GREEN LINE SOLAR & ENERGY STORAGE’s 25 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (11, 61.1%) used batteries recorded as Tesla.

22 of 24 battery-paired PG&E and SCE installs (91.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1125
Hyundai33
Mission Solar33
REC34
Briggs & Stratton, LLC1not in top list
Inverter makerEnphase1125
Tesla1111
Sol-Ark45
SMA11
SolarEdge13
Battery makerTesla1111
Enphase58
Lithion Battery Inc.22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 42 of 43 installs, inverters on 43. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1075546GREEN LINE SOLAR & ENERGY STORAGE (Corporation)CLEARC-46 Solar ContractorMay 6, 2021May 31, 202743

License numbers are the ones the utilities recorded on the interconnection applications (43 of 43 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1075546. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Sonoma18
Marin8
Contra Costa4
Napa4
Alameda2
San Mateo2
Santa Clara2
Fresno1
Lake1
San Francisco1

Top cities

CityInstalls
Santa Rosa6
Healdsburg4
Napa4
Sonoma4
Novato3
Atherton2
Fremont2
Alamo1
Belvedere1
Bodega Bay1
Corte Madera1
Cotati1
Fresno1
Glen Ellen1
Lakeport1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GREEN LINE SOLAR & ENERGY STORAGE43

Common questions

Where does GREEN LINE SOLAR & ENERGY STORAGE install solar?

Its installs are spread across 10 counties. The most are in Sonoma County (18 installs), followed by Marin County (8).

How often does GREEN LINE SOLAR & ENERGY STORAGE install batteries with solar?

55.8% of its interconnected solar installs include battery storage across all years, and 76.0% in the last 24 months (19 of 25).

How many GREEN LINE SOLAR & ENERGY STORAGE installs are under NEM 3.0 (the Net Billing Tariff)?

14 of its 43 interconnected installs (32.6% of the 43 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 85.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.