Greenhill has 57 residential solar installs interconnected in California, active in the records from 2013 through 2018 (Aug 28, 2013 to Feb 23, 2018), most of them in Los Angeles County (27), Ventura County (12) and San Bernardino County (11). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
57
Last 24 months
0
Total capacity
247.2 kW DC
Median system size
4.1 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 14 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Aug 28, 2013
Latest install
Feb 23, 2018
Counties
6
Utilities
SCE 57
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201390
2014350
2015120
201600
201700
201810
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 57 interconnected installs with a tariff recorded (57) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05698.2%not counted
NEM 2.011.8%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Greenhill’s installs. No residential system in the file lists a third-party owner name that matches Greenhill exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 1 of Greenhill’s 57 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as SolarWorld.

Across all years, 57 of Greenhill’s 57 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (32, 56.1%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld01
Inverter makerEnphase032
ABB012
Power-One07
Fronius03
SMA02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1 of 57 installs, inverters on 57. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (1 of 57 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
Los Angeles27
Ventura12
San Bernardino11
Orange3
Santa Barbara3
Riverside1

Top cities

CityInstalls
Alta Loma4
Thousand Oaks4
La Verne3
Lancaster3
Palmdale3
Rancho Cucamonga3
Santa Barbara3
Simi Valley3
West Covina3
Calabasas2
Camarillo2
Chino Hills2
Acton1
Arcadia1
Beverly Hills1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Greenhill56
greenhill1

Common questions

Where does Greenhill install solar?

Its installs are spread across 6 counties. The most are in Los Angeles County (27 installs), followed by Ventura County (12).

How often does Greenhill install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Greenhill installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 57 interconnected installs with a tariff recorded (57) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.