Halcyon Solar Construction

How many solar installs has Halcyon Solar Construction done in California, and which license number is on its installs?

Halcyon Solar Construction has 344 residential solar installs interconnected in California, active in the records from 2006 through 2025 (Dec 18, 2006 to Jan 21, 2025), most of them in Shasta County (244), Tehama County (80) and Sonoma County (6). The license number recorded on most of its installs, 937933, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
344
Last 24 months
5
Total capacity
3,644.5 kW DC
Median system size
9.9 kW DC
With battery storage
3.5% all time; 0.0% last 24 months
Third-party owned
0.0% of 344 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
5 installs, latest Jan 8, 2025
Ownership types recorded
none recorded
First install
Dec 18, 2006
Latest install
Jan 21, 2025
Counties
13
Utilities
PGE 342, SCE 2
CSLB license
937933

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2006 to 2026

YearInstalls interconnectedWith battery storage
200610
200700
200800
200900
201040
201150
201230
2013120
2014240
2015110
201690
201700
201850
2019350
2020531
2021472
2022454
2023784
2024101
202520
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

5 of its 344 interconnected installs (1.5% of the 344 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 20.0% of those include battery storage. The latest Net Billing Tariff install was approved Jan 8, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06920.1%not counted
NEM 2.027078.5%11 (4.1%)
Net Billing Tariff51.5%1 (20.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Halcyon Solar Construction’s installs. No residential system in the file lists a third-party owner name that matches Halcyon Solar Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of Halcyon Solar Construction’s 5 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used modules recorded as Canadian Solar.

In the last 24 months, 5 of Halcyon Solar Construction’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 80.0%) used inverters recorded as Enphase.

In the last 24 months, none of Halcyon Solar Construction’s 5 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

10 of 12 battery-paired PG&E and SCE installs (83.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar5124
Inverter makerEnphase4306
Tesla1not in top list
Battery makerEnphase010

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 312 of 344 installs, inverters on 344. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
937933Not found in the CSLB License Master file pulled Nov 4, 2026304

License numbers are the ones the utilities recorded on the interconnection applications (305 of 344 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Shasta244
Tehama80
Sonoma6
Placer3
Butte2
El Dorado2
Alameda1
Colusa1
Los Angeles1
Orange1
San Joaquin1
Solano1
Stanislaus1

Top cities

CityInstalls
Cottonwood112
Redding59
Anderson56
Palo Cedro33
Red Bluff29
Millville14
Bella Vista3
Gerber3
Igo3
Tehama3
Bodega Bay2
Chico2
Lincoln2
Shingletown2
Big Bend1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
HALCYON SOLAR CONSTRUCTION247
Halcyon Solar Construction96
Halcyon solar Construction1

Common questions

Where does Halcyon Solar Construction install solar?

Its installs are spread across 13 counties. The most are in Shasta County (244 installs), followed by Tehama County (80).

How often does Halcyon Solar Construction install batteries with solar?

3.5% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 5).

How many Halcyon Solar Construction installs are under NEM 3.0 (the Net Billing Tariff)?

5 of its 344 interconnected installs (1.5% of the 344 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 20.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.